or
Contact Us
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Biogas Steel Mould 8m3

  • China China  
  • Quantity Required: 1000
  • Last Updated:
    Posted on: 17 Apr 2024

  • Time Left: 12Y 7M
  • Destination Port: CN

RFQ Details

This product is composed of a number of steel moulding boards, and is used to construct the concrete digester. By using a steel moul, a 6 to 100m3 puxin biogas digester can be built within 48 hours.

The steel mould is reusable and can be used over 2000 times, last over ten years. It is very easy to build the concrete digester with the steel mould, because the constructers need no blueprint, and working on the steel mould is the only skill required.

Thus, using the steel mould can greatly increase the speed and quality of the concrete digester construction.

Detailed Product Description

part of the biogas system
***** for over 1000 times
2.High efficiency in construction
3.Quicken the building of digest