سعر فوب
أحصل على آخر سعر450000 USD /
|1 Minimum Order
بلد:
China
نموذج رقم:
01
سعر فوب:
450000 USD / أحصل على آخر سعر
الموقع:
china
سعر الحد الأدنى للطلب:
450000
الحد الأدني للطلب:
1
تفاصيل التغليف:
wooden box or pallet
موعد التسليم:
150days
القدرة على التوريد:
100
نوع الدفع:
T/T
مجموعة المنتج :
-
الشخص الذي يمكن الاتصال به bing
qianzhou, Wuxi, Jiangsu
Manufacturer direct sales AA and AAA alkaline battery production
line and production equipment as well as various accessories I.
Parameters of the alkaline production line 1. Design speed: **0
units/minute 2. Total power: Approx. *2KW 3. Total weight Approx.
*5 tons 4. Dimensions: (L×W×H) ****0×***0×**0mm II. Equipment
composing the alkaline battery production line 1. Ringing machine
2. Ring insertion machine 3. Upper mold sleeve machine . Glue
coating machine 5. Electrolyte adding machine 6. Liquid absorption
station 7. Lower mold sleeve machine 8. Pin insertion machine9.
Flanging machine *0. Battery loading machine III. Main auxiliary
equipment of the alkaline battery production line 1. Dust collector
for the line 2. Positive electrode production line 3. Dust
collector for the positive electrode production line 4. Battery
spot welding machine 5. Battery assembly machine6. Battery inkjet
machine 7. Battery testing machine 8. Negative electrode production
line 9. Battery paper winding machine *0. Battery loading *1.
Battery energy ring *2. Battery mold sleeve
4. Commissioning of the Alkaline Battery Production Line 1. Prepare
for the no-load commissioning of the equipment. 2 Commissioning
steps: (1) Adjust the dust cleaning controller to ensure the
correct sequence of actions for the electromagnetic pulse valves
and the correct order of dust cleaning units(2) Check the voltage
of the electromagnetic pulse valves and the electrical control
parts (*4V or **0V). (3) Check if seals on the equipment are loose
or fallen off. (4) Maintain the pressure of the compressed air for
spraying between 5~7 kg/cm². () Check if the motors and
mechanical transmission parts on the equipment are running
normally. (6) Check if the screws on the equipment are tightened.
(7) no-load commissioning of the equipment, requiring all parts to
run normally. (8) Conduct load commissioning of the equipment.
Require all parts to run normally adjust the cleaning cycle based
on the changes in equipment resistance (resistance method or timing
method).
بلد: | China |
نموذج رقم: | 01 |
سعر فوب: | 450000 / أحصل على آخر سعر |
الموقع: | china |
سعر الحد الأدنى للطلب: | 450000 |
الحد الأدني للطلب: | 1 |
تفاصيل التغليف: | wooden box or pallet |
موعد التسليم: | 150days |
القدرة على التوريد: | 100 |
نوع الدفع: | T/T |
مجموعة المنتج : | - |