يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
AA and AAA Alkaline Battery Production Line AA and AAA Alkaline Battery Production Line
Next

AA and AAA Alkaline Battery Production Line

450000 USD /

|

1 Minimum Order

بلد:

China

نموذج رقم:

01

سعر فوب:

450000 USD / أحصل على آخر سعر

الموقع:

china

سعر الحد الأدنى للطلب:

450000

الحد الأدني للطلب:

1

تفاصيل التغليف:

wooden box or pallet

موعد التسليم:

150days

القدرة على التوريد:

100

نوع الدفع:

T/T

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به bing

qianzhou, Wuxi, Jiangsu

الاتصال الآن

الوصف

Manufacturer direct sales AA and AAA alkaline battery production line and production equipment as well as various accessories I. Parameters of the alkaline production line 1. Design speed: **0 units/minute 2. Total power: Approx. *2KW 3. Total weight Approx. *5 tons 4. Dimensions: (L×W×H) ****0×***0×**0mm II. Equipment composing the alkaline battery production line 1. Ringing machine 2. Ring insertion machine 3. Upper mold sleeve machine . Glue coating machine 5. Electrolyte adding machine 6. Liquid absorption station 7. Lower mold sleeve machine 8. Pin insertion machine9. Flanging machine *0. Battery loading machine III. Main auxiliary equipment of the alkaline battery production line 1. Dust collector for the line 2. Positive electrode production line 3. Dust collector for the positive electrode production line 4. Battery spot welding machine 5. Battery assembly machine6. Battery inkjet machine 7. Battery testing machine 8. Negative electrode production line 9. Battery paper winding machine *0. Battery loading *1. Battery energy ring *2. Battery mold sleeve
4. Commissioning of the Alkaline Battery Production Line 1. Prepare for the no-load commissioning of the equipment. 2 Commissioning steps: (1) Adjust the dust cleaning controller to ensure the correct sequence of actions for the electromagnetic pulse valves and the correct order of dust cleaning units(2) Check the voltage of the electromagnetic pulse valves and the electrical control parts (*4V or **0V). (3) Check if seals on the equipment are loose or fallen off. (4) Maintain the pressure of the compressed air for spraying between 5~7 kg/cm². () Check if the motors and mechanical transmission parts on the equipment are running normally. (6) Check if the screws on the equipment are tightened. (7) no-load commissioning of the equipment, requiring all parts to run normally. (8) Conduct load commissioning of the equipment. Require all parts to run normally adjust the cleaning cycle based on the changes in equipment resistance (resistance method or timing method).

بلد: China
نموذج رقم: 01
سعر فوب: 450000 / أحصل على آخر سعر
الموقع: china
سعر الحد الأدنى للطلب: 450000
الحد الأدني للطلب: 1
تفاصيل التغليف: wooden box or pallet
موعد التسليم: 150days
القدرة على التوريد: 100
نوع الدفع: T/T
مجموعة المنتج : -

Send a direct inquiry to this supplier

إلى:

bing < Wuxi Norshun Intelligent Equipment Co. , Ltd. >

أريد أن أعرف: