سعر فوب
أحصل على آخر سعر29999 ~ 39999 USD / Bag ( Negotiable )
|1 Bag Minimum Order
بلد:
China
نموذج رقم:
BD-40E
سعر فوب:
29999 ~ 39999 USD / Bag ( Negotiable )أحصل على آخر سعر
الموقع:
Henan China
سعر الحد الأدنى للطلب:
29999 per Bag
الحد الأدني للطلب:
1 Bag
تفاصيل التغليف:
40hq Container
موعد التسليم:
45days
القدرة على التوريد:
5000 Bag per Year
نوع الدفع:
Western Union, L/C, T/T
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Sinoroader
undefined, Other
China Factory
Sinoroader mobile drummed asphalt melting bitumen decanter
The
processing procedure of Low price Drummed Asphalt
melting equipment Bitumen Decanter with *2% discount is to extract
the solid bitumen by melting method usually from the barrels, bags,
and wooden cases. Then the liquid bitumen will work for asphalt
mixing equipments and other industrial purpose.The Bitumen melting
machine is perfectly designed, safe, reliable and easy to operate.
The low energy consumption and environmental pollution makes it the
first choice of asphalt melting equipment.
Main
Features of Low price Drummed Asphalt melting equipment Bitumen
Decanter with *2% discount:
1. It utilizs
both burning air and oil heating pipe to melt the bitumen, more
beneficial for clients.
2. Thermal
oil furnace inside the main body, small, flexible and easy to
operate.thermal oil furnace.
3. The
equipement is given the ability to turn over the barrel, no need to
do it yourself.
4. Releases
no air pollution, processing part is well protected and
sealed.
5. Auto
temp-control and bitumen leveling system makes it smart.
6. Low
requirement and cost on the transportation, because it's excellent
structure.
7. Install it
anywhere you want, leave your excavator away, it's very
simple.
8. Famous
burner brand makes it more trustworthy.
9. Longer
service life.
Working
Principle of Low price Drummed Asphalt melting equipment Bitumen
Decanter with *2% discount:
The hot oil
flows into the melter to heat the melting room. Then the asphalt
barrels (covers removed by operators) were packed in the cart
upside down, and cart starts running. Close the door once the cart
goes in to avoid heat loss. Asphalt starts to take off from the
bucket and fells into the heating trough (the bottom); when the
trough is full (in order to ensure the speed, you must keep pumping
the asphalt oil from stem to stern), the bitumen pumps will start
so the asphalt can be discharged, when all the bitumen fell off the
barrels, you can refill the cart regardless of whether the asphalt
heating trough is empty.
Main Parameters of Low price Drummed Asphalt melting equipment
Bitumen Decanter with *2% discount:
Model | DT*4 | DT*6 | DT*8 |
Capacity | **6t/h | **8t/h | ***0t/h |
Melting Type | Continuous | Continuous | Continuous |
Structure | Integrated | Integrated | Integrated |
Bitumen Temperature | ******0ºC | ******0ºC | ******0ºC |
Bitumen Storage Capacity | *1m3 | *7m3 | *7m3 |
Quantity of Barrels/Cycle | *8 or *0units | *8 or *2units | *2 or *8units |
Hot Capacity of Transfer Oil Heater | **0,**0Kcal/h | **0,**0Kcal/h | **0,**0Kcal/h |
Transfer Oil Temperature | ******0ºC | ******0ºC | ******0ºC |
Total Power | *6kw | *4kw | *6kw |
Weight | *5t | *0t | *4t |
Hot Oil System Dimensions | ***0x***0x***0mm | ***0x***0x***0mm | ***0x***0x***0mm |
Bitumen Melter Dimensions | ***0x***0x***0mm | ****0x***0x***0mm | ****0x***0x***0mm |
بلد: | China |
نموذج رقم: | BD-40E |
سعر فوب: | 29999 ~ 39999 / Bag ( Negotiable ) أحصل على آخر سعر |
الموقع: | Henan China |
سعر الحد الأدنى للطلب: | 29999 per Bag |
الحد الأدني للطلب: | 1 Bag |
تفاصيل التغليف: | 40hq Container |
موعد التسليم: | 45days |
القدرة على التوريد: | 5000 Bag per Year |
نوع الدفع: | Western Union, L/C, T/T |
مجموعة المنتج : | bitumen decanter |