سعر فوب
أحصل على آخر سعر100000 ~ 300000 / Set
|1 Set Minimum Order
بلد:
China
نموذج رقم:
BL
سعر فوب:
100000 ~ 300000 / Set أحصل على آخر سعر
الموقع:
Henan, China (Mainland)
سعر الحد الأدنى للطلب:
100000 per Set
الحد الأدني للطلب:
1 Set
تفاصيل التغليف:
electrical equipment are packaged by high quality plywood crates, main beams are packaged by plastic
موعد التسليم:
Shipped in 40 days after prepayment
القدرة على التوريد:
50 Set per Month
نوع الدفع:
Other, L/C, T/T
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Neil
Xinxiang, Henan
The unique China HSHCL **0 ton bridge
construction beam launcher equipment is designed for
subway project. According to the situation of present railway with
less subgrade, more bridges and tunnels which connected too
closely, our company design and manufacture the new and special
beam launcher. It is mainly used for lifting concrete girders in
bridge construction in general railway and highway
projects.
This patented product is an excellent piece of equipment for
erecting Bridge Beams; whether steel or precast concrete, any
shapes or sections, with curve or straight, with slope, skew or
super-elevation.
The Beam Launcher comes with centralize control system, multi-speed
Crane and Wagons, Hydraulic powered Support, Mechanical powered
Self Advancing system, and spare-parts.
â–ª Crane traveling limit switch.
â–ª Overload protection device.
â–ª Lifting height limit device.
â–ª Voltage lower protection function .
â–ª Phase sequence protection function.
â–ª Emergency stop function.
â–ª Rain cover for outside hoist, driving units, electric
cubicle.
â–ª Warning indicator : flashing nights and warning
sounds.
â–ª Wire-less infra-detector for anti-collusion.
Our
Company
Henan
Shenghua Heavy Crane Group is a big enterprise specialized in
researching, developing, producing and exporting.
It
mainly produces China HSHCL **0
ton bridge construction beam launcher equipment, launching gantry
crane, overhead crane and gantry crane, movable scaffolding system
crane, form traveler, straddle carrier, tyre transporter, beam
trolley, portal crane and electric winch, electric hoist and all
kinds of accessories, which widely cover machinery, metallurgy,
electric power, railway, water conservancy, ports, terminals and
other industries.
FAQ
1. Whats the information should I provide when inquiry about the China HSHCL **0 ton bridge construction beam launcher equipment?
a.we need the Bridge Drawing;the Maximum longitudinal slope and the
Maximum Transverse slope;
b.The Girder/beam drawing;
2. How many
Personnel and equipment to assemble launching gantry in the
worksite we need?
Personnel: 8 to *0 workers equipment
Truck crane > *0 t : 2 sets
Φ*9.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(*2 pound and 8 pound): 1 set for each
Wrench and pincher: several
Gradienter: 1 set
3. What are
inspection standard for load test of Beam launcher
cranes?
â—†Dynamic load test: 1.1 times rated load.
â—†Static load test: 1.*5 times rated load.
4. How to
make highway bridge concrete girders?
â—†Highway Bridge concrete girders could be made by 4 methods:
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.
5. How
about maintenance of Beam launcher cranes?
a. Lubricating:Working performance and service life of all
mechanisms of crane depend on lubricating to a big extent.
b. Steel wire rope:Fracture of wire has to be specially noticed. A
new steel wire rope has to be changed immediately with the
condition of broken wire, broken strands and wear loss to scrapping
standard.
c. Spreader: The spreader has to be checked regularly.
d. Pulley block:Mainly check rope race wearing condition, check
whether wheel flange is cracked and whether pulley could get stuck
in the axle or not.
e. Wheels:Regularly check wheel flange and tread, a new wheel has
to be immediately replaced as crack part or wearing in wheel flange
reaches *0% of wheel thickness;Re-polishing has to be done as
diameters between two driving wheels on tread differs more than
D/**0, or there are severe scar on the tread.
f. Brake: Check one time per shift; The brake should be in accurate
movement, and pins do not allow to be stuck. Brake shoes shall fit
brake wheels correctly; the brake shoes interval shall be equal to
open them.
بلد: | China |
نموذج رقم: | BL |
سعر فوب: | 100000 ~ 300000 / Set أحصل على آخر سعر |
الموقع: | Henan, China (Mainland) |
سعر الحد الأدنى للطلب: | 100000 per Set |
الحد الأدني للطلب: | 1 Set |
تفاصيل التغليف: | electrical equipment are packaged by high quality plywood crates, main beams are packaged by plastic |
موعد التسليم: | Shipped in 40 days after prepayment |
القدرة على التوريد: | 50 Set per Month |
نوع الدفع: | Other, L/C, T/T |
مجموعة المنتج : | Beam Launcher |