يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
Next

Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork

( Negotiable )

|

200 Piece Minimum Order

بلد:

China

نموذج رقم:

010

سعر فوب:

( Negotiable ) أحصل على آخر سعر

الموقع:

CN

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

200 Piece

تفاصيل التغليف:

wooden case+shringking film

موعد التسليم:

60 days for OEM, 15 days for ready goods

القدرة على التوريد:

3000 Piece per Week

نوع الدفع:

L/C, T/T

مجموعة المنتج :

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Aliciamao

Wuhan, Hubei

الاتصال الآن

مواصفات المنتج

  • Brand Name: NPCT
  • Usage: Outdoor
  • Supply Type:OEM/ODM
  • Size:customized
  • Color:White

الوصف

Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork

The company's new hollow plastic building formwork and technology plastics are the green building materials that the country strongly advocates for energy conservation and environmental protection and low carbon economy. With imported polypropylene resin as the base material, it adopts the industry's top technology, has greater bearing strength, does not run the mold to increase the mold, and has the characteristics of recycling, flame retardant and waterproof, and high turnover rate. It has become the first choice of the construction industry and can completely replace the traditional wood. Mold, wood, and square steel are widely used in construction, water conservancy, hydropower, bridge and tunnel engineering. 





Product Details

Product Advantages:

1. Low average cost (can be reused for more than **0 times)

2. Safe (can load *0KN/m2)

3. Light weight (****5kg/m2)

4. Good hardness

5. High efficiency on installing & dismantling 

6. Environmental friendly





FAQ

 Q: Are you a factory or trading company?

 A: Factory of pp formwork plastic formwork

Q: How can I get the sample?

 A:We provide sample free of charge 2 work days

Q: What payment terms do you do?

 A: *0% T/T as down payment, the balance paid by T/T before shipment

or **0% irrevocable L/C At sight.

Q: What is your MOQ for pp formwork plastic formwork?

 A: We have some stock for common standard size.

Q: How long is your delivery time?

 A: ****5 work days

Q: How to pack the product?

 A: On pallet and carton or as customers requirement.

Q: How many quantity can load for one *0/*0 container?

 A: Depend on the different size of pp formwork plastic formwork.









Advantages of aluminum frame plastic formwork

1.  Shorten construction period and reduce labor costs.

2.  Convenient installation and disassembly, improve construction efficiency

3.  High turnover full recovery, average cost lower than traditional wood molds

4.  Good surface forming effect, free of mold release agent

5.  Good stability, high bearing capacity and wide application range

6.  Many turnover times, easy to clean and maintain

7.  High efficiency of site maintenance, clean and tidy construction site

8.  Green environmental protection, low carbon emission reduction

9.  Support system is convenient and the site is easy to manage.

*0.  High standard universality and high recycling value.


WHY YOU CHOOSE NPCT Industrial (Hubei)CO., LTD TO BE YOUR SUPPLIER?

1. We are professional manufacturer with many years of experiences.

2. We have advanced facilities for production, most of the products are welded by automatic machine.

3. We have ISO***1 certificates which can assure the quality of our products.

4. We have strong engineering team that can give best solution for your projects.





1#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
2#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
3#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
4#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
5#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
6#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
7#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork
8#  Construction Aluminum Formwork, Plastic Shuttering Formwork, Concrete Slab Formwork


 

   

بلد: China
نموذج رقم: 010
سعر فوب: ( Negotiable ) أحصل على آخر سعر
الموقع: CN
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: 200 Piece
تفاصيل التغليف: wooden case+shringking film
موعد التسليم: 60 days for OEM, 15 days for ready goods
القدرة على التوريد: 3000 Piece per Week
نوع الدفع: L/C, T/T
مجموعة المنتج : formwork

Send a direct inquiry to this supplier

إلى:

Aliciamao < NPCT Industrial (Hubei)CO., LTD >

أريد أن أعرف: