سعر فوب
أحصل على آخر سعر|
1 Minimum Order
بلد:
China
نموذج رقم:
CP-GTF
سعر فوب:
الموقع:
-
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
1
تفاصيل التغليف:
pallet
موعد التسليم:
1-2 DAYS
القدرة على التوريد:
5000 Piece per Week
نوع الدفع:
PayPal, T/T
مجموعة المنتج :
-
الشخص الذي يمكن الاتصال به Eline
Xiamen, Fujian
Introduction:
Our spiral pile is dry method not
using concrete.
It is possible to work on the soft ground without excavating work and removal og surplus soil.
Constructing dulation and cost cab be reduced due to dry methode with all-weather work.
It also contributes to the vitalization of construction business
for winter time.
Features:
1.reduce installation cost at worksite
2.deline labor cost
3.eco-friendly methord without concrete foundation
4.without excavating,no surplus soil
5.pulled out from soil easily
6.used for different places,even temporary structures
7.design avoiding underground utilities
Applied site:
1.solar farm
2.solar ground mount structure
3.wind power generation foundation
4.highway
5.park
6.street light
7.traffic light
8.temporary structure/house
9.wooden house
*0.Structure
base of electric power
*1.Transmitting
station foundation
*2.Vinyl
greenhouse base
*3.Anti-typhoon measure anchor
بلد: | China |
نموذج رقم: | CP-GTF |
سعر فوب: | أحصل على آخر سعر |
الموقع: | - |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | 1 |
تفاصيل التغليف: | pallet |
موعد التسليم: | 1-2 DAYS |
القدرة على التوريد: | 5000 Piece per Week |
نوع الدفع: | PayPal, T/T |
مجموعة المنتج : | - |