سعر فوب
أحصل على آخر سعر|
1 Piece Minimum Order
بلد:
China
نموذج رقم:
Crew cut tower crane
سعر فوب:
الموقع:
Yantai
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
1 Piece
تفاصيل التغليف:
Naked, 40HC Container
موعد التسليم:
7
القدرة على التوريد:
1000 Piece per Year
نوع الدفع:
T/T
مجموعة المنتج :
-
الشخص الذي يمكن الاتصال به Mr. Nick
High-technical Devetopment District, Yantai, Shandong
QTZ**5 (HS***6P) tower by my company is developed and large
tower. The tower for turning on the shelf, the car horn level arm,
no tower cap, hydraulic ZiSheng. Rated lifting torque for ***0 kN
m., independent erection was maximum lifting height of *3.5 m, and
attached to the maximum lifting height is **0 m, maximum lifting
weight for 8 tons, the most greatly place up to 1.6 tons of weight,
the most greatly for *5 m.
The biggest characteristic tower: (1) the standard section of the
space is little chip, transport costs low. (2) tower overall
intensity is high, most of the materials are used the tower Q**5B
(manganese steel), make use of the tower more security, the service
life is longer. (3) due to the unique design, making the overall
upper tower weight, reduce the prevailing wind direction, force
reduction. (4) the flat roof top without tower cap design, more can
apply the requirement of cross homework, and can even make full use
of space and the effective high tower. (5) the forearm unique
design has altered the forearm force situation, no longer tension
and compression of alternating stress. (6) the forearm
transformation convenient, do not need to be born can change the
forearm arm. At the same time the connection of the festival is
also very simple. (7) greatly reduce the disassembling of tower
crane equipment needed for the lifting capacity requirements. Crew
cut tower due to the elimination of the tower head, the unit of
small, height of installation quality low, the biggest installation
height of the tower at the same level than other reduce more than
*0 m. Ordinary tower crane boom installation must be on the ground
to arms frame, tension bar and so on all connect the integral
hoisting again, this time to the requirements of the lifting
equipment is the highest, with a lot of lifting weight and lifting
height. Because arm root pin shaft even good after he will raise
many big arms to the arm bars even good, install the arm bars was
easy to appear safety accidents, and even tower was completely
improve the installation. This design has fully considered the
special needs of the users, using a variety of basic form,
especially the tower can be made according to the customer demand
walk type, expand the application places.
The machine has a hoisting, slewing, derricking and roof up four
work units, but alone or composite action to improve the work
efficiency. Roof up mechanism for mai take high or drop tower;
Three big institutions through the variable frequency speed
regulation produce various different speed to meet the needs of the
different working conditions. Hoist boom can be positive and
negative spin **0 °, slewing, luffing flexible reliable, hoisting
in place accurate, and can be one-time meet in vertical and
horizontal construction of transportation needs.
بلد: | China |
نموذج رقم: | Crew cut tower crane |
سعر فوب: | أحصل على آخر سعر |
الموقع: | Yantai |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | 1 Piece |
تفاصيل التغليف: | Naked, 40HC Container |
موعد التسليم: | 7 |
القدرة على التوريد: | 1000 Piece per Year |
نوع الدفع: | T/T |
مجموعة المنتج : | - |