A. Process principle
Full continuous atmospheric pressure waste tyre pyrolysis
equipment adopted automatic feeding,automatic deslagging,the
materials in the reactor,screw driving from the low temperature
area to high temperature area and pyrolysis,high automatic,big
capacity,high safety.Sloved many shortcoming of the fixed bed
type and othe types pyrolysis equipments,quantity production,low
capacity,long cycle,big consumption,heavy physical labour,bad
working environment.In the meanwhile,solved the rotary kiln’s
problem,many sealed point,potential safety and air pollution
because of it is easy leakage of oil-oulet and hole of material
discharging. Full automatic atmospheric pressure waste tyre
pyrolysis equipment adopted original inner screw propeller,not
only ensure the materials heating uniformly,pyrolysis fully,but
also ensure the pyrolysis gas and carbon black powder separated
fully,incomparable advantage with the rotary kiln pyrolysis
machine which the pyrolysis gas mixed with carbon and no
separated space,easy to bring vast carbon black powder and block
the tubes,equipment and pollute the quality of oil.
B.Process flow
1. The cut waste tyre pieces are fed into feeding machine and
preheated then transported into the reactor. Materials are driven
forward in the reactor and pyrolyzed. The gas passes through the
evaporation pipe on top of the reactor and enters the gas liquid
separator. The broken down carbon black and steel wires are
discharged by the auto discharging machine into the carbon black
conveyor, and the steel wires are seperated from the carbon black
with the magnetic selector. The carbon black will be given to the
carbon black processing machine.
2.The condensed fuel oil comes into relay tank.When oil level
of relay tank upto the fixed height,then use pump into the
storage tank.
3. The waste gas was discharged from the top of relay tank into
waste gas buffer tank, inhaled by the vacuum pump into air liquid
seperator, where the waste gas is seperated from liquid and goes
into water sealed tank. From the water sealed tank, waste gas
enters the hot air furnace for burning.
4.Cooling water is sucked by the pump from water recycling pool
and sent to the condenser tubes. Water travels in the tube from
bottom to top and returns to recycling water pool.
5.Steam is generated by the boiler and is passed to the
pyrolysis kettle feeding steam inlet, discharging steam inlet and
kettle internal inlet, being over heatedby the kettle and finally
enter the kettle.
6.Fuel oil is dehydrated in the storage tank, sucked by the
pump, passing the filter and goes into the fuel oil tank. The oil
is supplied to the steam boiler and hot air furnace.
بلد: |
China |
نموذج رقم: |
-
|
سعر فوب: |
100000 ~ 600000 / Set ( Negotiable ) (قابل للتفاوض)
أحصل على آخر سعر
|
الموقع: |
- |
سعر الحد الأدنى للطلب: |
100000 per Set |
الحد الأدني للطلب: |
1 Set |
تفاصيل التغليف: |
export packing |
موعد التسليم: |
60 days |
القدرة على التوريد: |
20 Set per Year |
نوع الدفع: |
T/T, L/C |
مجموعة المنتج : |
- |