يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Integrated sewage treatment equipment
Next

Integrated sewage treatment equipment

20000 ~ 50000 / Set ( Negotiable )

|

1 Set Minimum Order

بلد:

China

نموذج رقم:

YMIT

سعر فوب:

20000 ~ 50000 / Set ( Negotiable ) أحصل على آخر سعر

الموقع:

china

سعر الحد الأدنى للطلب:

20000 per Set

الحد الأدني للطلب:

1 Set

تفاصيل التغليف:

standard export packing

موعد التسليم:

20 days from receive the deposit

القدرة على التوريد:

200 Set per Month

نوع الدفع:

T/T

مجموعة المنتج :

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به cathy

Changan Road,Jiaonan city, Qingdao, Shandong

الاتصال الآن

مواصفات المنتج

  • color:green

الوصف


STEP ONE - The first step for the raw sewage when it reaches the Wastewater Treatment Plant is the removal of heavy particles from the liquid. This happens in the Grit and Screen Building. Here, the sewage passes through a screen system to remove any material greater that *2.5 mm in size.    This material is removed and transported to the landfill.  The wastewater then passes through a centrifical grit removal system. 

STEP TWO - The wastewater then travels to the Primary Sedimentation Basins where its speed is reduced even further. This allows fine particles to settle. The settling process divides the materials into settled material at the bottom of the basins, called sludge, and wastewater.

The sludge is moved to hoppers at the ends of the tanks by scrapers and is sent to the Fermenters (large, closed tanks with mixing mechanisms). Here, Volatile Fatty Acids (VFAs) are created through fermentation (a chemical process that breaks down organic matter). These VFAs are then used in the next stage of treatment.  Small amounts of fermenter sludge is periodically wasted to the Digesters to ensure the continued success of the fermentation process.

As the wastewater leaves these basins, any floating grease or scum is skimmed from its surface and sent to the Digesters. The wastewater, now called primary effluent, is pumped to the Bioreactors.

STEP THREE - The bioreactors are a state-of-the-art Biological Nutrient Removal (BNR) facility. The wastewater is treated by using micro-organisms instead of traditional chemical methods to break down the unsettled particles and nutrients. The micro-organisms do this by using the nutrients in the wastewater as a food source. VFAs created by the fermenters are used in this process by some of the micro-organisms. The process of BNR is environmentally friendly and helps ensure a cleaner, more natural final product.

STEP FOUR - After nine hours in the Bioreactors, the effluent flows by gravity to the Secondary Clarifiers. Here the micro-organisms in the wastewater settle to the bottom and are returned to the Bioreactors.

STEP FIVE - The clear effluent from the Secondary Clarifiers flows through the UV Disinfection system. Finally the treated effluent flows over a weir and into the South Saskatchewan River.

STEP SIX - The sludge and/or scum removed from the Primary Sedimentation Basins, Fermenters and Secondary Clarifiers will remain in the Digester at *5 degrees Celsius for approximately *0 days. Because there is no oxygen present in the Digesters, it is an anaerobic process and the bacteria begin to produce methane as they break down the sludge. The methane is used as a fuel for the boilers in the Heating Building that heat the Wastewater Treatment Plant.

STEP SEVEN - Stabilized sludge, the end product from the digestion process, is pumped *2 kilometres north of the Plant and is stored in deep ponds. Twice a year the sludge is pumped out and spread on farmers' fields by a process called liquid injection. The sludge is an excellent soil conditioner adding nutrients and moisture.

Highly trained Plant operators in the control room closely monitor all aspects of the Wastewater Treatment Plant, twenty-four hours a day, seven days a week. The on-site laboratory continuously tests the processes to ensure that the water going back into the river meets or exceeds environmental criteria.

بلد: China
نموذج رقم: YMIT
سعر فوب: 20000 ~ 50000 / Set ( Negotiable ) أحصل على آخر سعر
الموقع: china
سعر الحد الأدنى للطلب: 20000 per Set
الحد الأدني للطلب: 1 Set
تفاصيل التغليف: standard export packing
موعد التسليم: 20 days from receive the deposit
القدرة على التوريد: 200 Set per Month
نوع الدفع: T/T
مجموعة المنتج : waste water treatment equipment

Send a direct inquiry to this supplier

إلى:

cathy < Qingdao Yimei enviroment Project Co, .Ltd >

أريد أن أعرف: