يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
K11 two components waterproof coating
Next

K11 two components waterproof coating

|

1 Ton Minimum Order

بلد:

China

نموذج رقم:

YDS-18

سعر فوب:

أحصل على آخر سعر

الموقع:

China

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

1 Ton

تفاصيل التغليف:

�20kg/plastic cask âï¿&fra

موعد التسليم:

1-7days

القدرة على التوريد:

10 Ton per Day

نوع الدفع:

T/T, L/C

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Nike

Changping, Beijing

الاتصال الآن

مواصفات المنتج

  • State: Liquid Coating
  • Brand Name: YIDISHUI

الوصف

*Brief introduction

It is based on proprietary technology of k**1 and uses the mechanism of cementitious capillary crystalline materials and concrete, and combines with the adhesion, water holding capacity and flexibility of polymer emulsion and concrete, cement mortar base course, which has very good waterproofness.

*Main features

*The coating can restrain bacterial growth and prevent humidity

*Can be constructed on rough base

*Nontoxic and harmless, can be used in drinking pool and fishpond

*Can directly stick with tile or make level

*Can be constructed on moist base

*Can cover tiny crack and resist slight shaking.

*Packaging
 
 â‘ *0kg/plastic cask

 
 â‘¡*0kg/plastic cask


*Where to use

Facades of the overall water seepage,kitchen /toilet,underground construction,elevators, channels,reservoirs,edible and non-edible water pool,waterproof floor.

How to use:

1.Base course: The base course must be solid, clean, flat, and humid, no greasy dirt or dust; when there is a flaw or crack, it must be repaired by using cement mortar; and external corners should be made into circular arcs by spatula.

2.Stir and mix: Pour the additive into container with a certain ratio then pour the powder into the additive and stir adequately till they become mucilage without granules; to prevent layering and sediment, stir intermittently during use.

3.Construction: Directly use brush or brush roll to brushing the base course evenly, and make sure that there are no missed areas; brush 1 layer for damp proof, and **3 layers for waterproof. Brush the second layer when the first layer is not sticky (**2h), and the direction shall be vertical.

4.Coating protection: After finish the slurry constructing, the coating shall be protected including pedestrians prohibited; rain erosion, insolation or sharp objects etc, it does not need special protection after the coating has been dry.

5.Coating maintenance: After construction have been done for *4h, use wet cloth to cover or spray with water to maintain the coating for **3days; if theres high humidity or airless, drying time of coating will be longer, conversely it will shorter. Use mechanical ventilation to speeding if necessary for the project schedule.

بلد: China
نموذج رقم: YDS-18
سعر فوب: أحصل على آخر سعر
الموقع: China
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: 1 Ton
تفاصيل التغليف: �20kg/plastic cask âï¿&fra
موعد التسليم: 1-7days
القدرة على التوريد: 10 Ton per Day
نوع الدفع: T/T, L/C
مجموعة المنتج : -

Send a direct inquiry to this supplier

إلى:

Nike < BEIJING JIANHAI ZHONGJIAN INTERNATIONAL WATERPROOF MATERIALS CO., LTD >

أريد أن أعرف: