precast segmental box girder  mouldsfor Prestressed Concrete Box Girder Construction
Next

precast segmental box girder mouldsfor Prestressed Concrete Box Girder Construction

( Negotiable )

|

20 Ton Minimum Order

بلد:

China

نموذج رقم:

05

سعر فوب:

( Negotiable ) أحصل على آخر سعر

الموقع:

-

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

20 Ton

تفاصيل التغليف:

standard export packaging

موعد التسليم:

30-60days after placed order

القدرة على التوريد:

5000 Ton per Month

نوع الدفع:

L/C, T/T

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Jack

139# Fenghuang 6Rd, Jinan, Shandong

الاتصال الآن

مواصفات المنتج

  • material:Q235 or Q345
  • Color:according to customers' requirment

الوصف

Professional precast formwork with ISO certificate

Box girder formwork segmental is necessary to build support and pour concrete at the construction site and traffic can be opened during the construction, which greatly reduces pressure on the traffic by the construction; module construction accelerates the onsite construction rates, which are more than a double for the traditional construction methods. This method increases science & technology content and technical level in urban viaduct project construction and massive use can reduce project cost.





Specifications

1 Materal: Q**5/Q**5

2 which reduces influences on surrounding residents and environment

3 Large lifting equipment is not requested

Box girder formwork segmental is necessary to build support and pour concrete at the construction site and traffic can be opened during the construction, which greatly reduces pressure on the traffic by the construction; module construction accelerates the onsite construction rates, which are more than a double for the traditional construction methods. This method increases science & technology content and technical level in urban viaduct project construction and massive use can reduce project cost.

بلد: China
نموذج رقم: 05
سعر فوب: ( Negotiable ) أحصل على آخر سعر
الموقع: -
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: 20 Ton
تفاصيل التغليف: standard export packaging
موعد التسليم: 30-60days after placed order
القدرة على التوريد: 5000 Ton per Month
نوع الدفع: L/C, T/T
مجموعة المنتج : -

Send a direct inquiry to this supplier