سعر فوب
أحصل على آخر سعر|
500 Minimum Order
بلد:
China
نموذج رقم:
YL-21148
سعر فوب:
الموقع:
-
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
500
تفاصيل التغليف:
-
موعد التسليم:
1-2weeks
القدرة على التوريد:
-
نوع الدفع:
-
مجموعة المنتج :
-
الشخص الذي يمكن الاتصال به Tyron
Donggang Road, Shijiazhuang, Hebei
BWF
Certificated product
The basic
requirements:
1.The base for
the pavement must be clean, dry, smooth and no cracks.
2.The concrete ground is supposed to have low moisture content less
than 2.5% and the gypsum ground should be less than 0.5%.
3.Error of 2 meter ruler on floor surface should within 3mm.
Besides, wooden floor board, compound wood floor, tile floor,
marble floor and terrazzo floor which could arrive the flatness
requirement can also be paved.
Installation
instruction:
The ground should be cleaned before
installation, unfolded the floor tiles should be on the ground more
than *4 hours in advance and the local temperature should not below
*5°C. Leave 5cm more on each end when cutting.
1.Movable assemblage The pieces of flooring are cemented together
with the special single-sided adhesive tape provided by the
manufacturer, but the flooring in a whole would not adhere to the
ground in order to facilitate the moving in the future.
2.Partial fasted cementation: Starting from the borderline of the
flooring ,paint glue for cementation inward for *0cm.Or use the
double-sided tape provided by the manufacturer for bonding.
3.Full-glue cementation: Cover the whole ground under the flooring
with glue for cementation.(Basketball, tennis courts would be
preferable to use the full-glue cementation, otherwise it will
affect the rebound when the ball drop to the
ground)
بلد: | China |
نموذج رقم: | YL-21148 |
سعر فوب: | أحصل على آخر سعر |
الموقع: | - |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | 500 |
تفاصيل التغليف: | - |
موعد التسليم: | 1-2weeks |
القدرة على التوريد: | - |
نوع الدفع: | - |
مجموعة المنتج : | - |