يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Roadphalt SBS Modified Asphalt Stabilizer
Next

Roadphalt SBS Modified Asphalt Stabilizer

1400 ~ 1600 USD / Ton

|

1 Ton Minimum Order

بلد:

China

نموذج رقم:

-

سعر فوب:

1400 ~ 1600 USD / Ton أحصل على آخر سعر

الموقع:

-

سعر الحد الأدنى للطلب:

1400 per Ton

الحد الأدني للطلب:

1 Ton

تفاصيل التغليف:

25 kgs/bag

موعد التسليم:

15-30 days after payment by sea

القدرة على التوريد:

20 Ton per Day

نوع الدفع:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal

مجموعة المنتج :

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Gina

Shanghai, Shanghai

الاتصال الآن

مواصفات المنتج

  • Brand Name: Roadphalt

الوصف

I. Product Profiles

 

Roadphalt SBS modified asphalt stabilizer is a kind of high performance asphalt additives which is researched and developed by Shanghai Roadphalt Technology Co., Ltd. The main effect is to improve thermal stability of modified asphalt, and solve the problem of storage segregation.

Product appearance: gray-black powder

Technical Index:
 

 

 

II. Product Features:

 

1. Its used in improving storage stability and softening point of modified asphalt, reducing dosage of SBS and improving comprehensive index of modified asphalt. After adding the  stabilizer, a stable phase interface adsorptive layer is formed between the polymer phase in modified asphalt and based asphalt, which reducing surface tension of phase interface, increasing affinity between two phase, and improving compatibility between two-phase.

 

2. To overcome the shortcoming of low softening point from modified asphalt, the softening point of modified asphalt can be increased by more than *0 degree under usual conditions, and keep the softening point of modified asphalt from reducing.

 

3. It can keep the modified asphalt from segregation during storage and transportation. The modified asphalt storage period can be up to *0 days.

 

4The product has safety and environmental protection performance, as a non flammable product, it is stable at room temperature, non-toxic, without peculiar smell, high flash point.

 

III. The Dosage and Method

Dosage: 1.**4.0‰ of the total asphalt

Temperature: ******5 degree.

Method: Mix polymer and asphalt by colloid mill for **5 hoursthen add the product, and continue mixing for **8 hours. The mixing time should be subject to laboratory formulation, dosage is 1.**2.5‰ of the total asphalt. The product can also be evenly added into matrix asphalt with polymer at the same time, which is milled by colloid mill after adding, then put them into development tank to develop, dosage is 2.**4.0‰ of the total asphalt.

 

IV. Storage and Transportation

 

Storage: It can be stored at room temperature.

Transportation: Convenient to transport, no need special vehicle.

 

 

بلد: China
نموذج رقم: -
سعر فوب: 1400 ~ 1600 / Ton أحصل على آخر سعر
الموقع: -
سعر الحد الأدنى للطلب: 1400 per Ton
الحد الأدني للطلب: 1 Ton
تفاصيل التغليف: 25 kgs/bag
موعد التسليم: 15-30 days after payment by sea
القدرة على التوريد: 20 Ton per Day
نوع الدفع: T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
مجموعة المنتج : Shanghai RPT Co.,Ltd

Send a direct inquiry to this supplier

إلى:

Gina < Shanghai Roadphalt Asphalt Technology Co >

أريد أن أعرف: