سعر فوب
أحصل على آخر سعر|
- Minimum Order
بلد:
China
نموذج رقم:
Steam Rooms
سعر فوب:
الموقع:
-
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
-
تفاصيل التغليف:
-
موعد التسليم:
-
القدرة على التوريد:
-
نوع الدفع:
-
مجموعة المنتج :
-
الشخص الذي يمكن الاتصال به Henry
Wugang load, Foshan, Guangdong
Water supply requirement: separate hot and cold s are
required, each at a pressure of 1.5 - 3 Bar. NB: if the water
pressure is below this range a twin negative head pump must be used
to boost the hot and cold supply.
A pump must not be used on the output of a combi boiler.
Installation guidelines:
**0mm clearance must be allowed for between the cabin roof and
ceiling to allow adequate venting. It is essential that a fully
qualified electrician and fully qualified plumber install the unit
in accordance with current regulations. The product requires hard
wiring into the mains.
*Please note that due to manufacturer improvements slight
differences can occur when compared to images used such as control
panel but all features are generally the same and are normally
improved upon as aresult in changes.
بلد: | China |
نموذج رقم: | Steam Rooms |
سعر فوب: | أحصل على آخر سعر |
الموقع: | - |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | - |
تفاصيل التغليف: | - |
موعد التسليم: | - |
القدرة على التوريد: | - |
نوع الدفع: | - |
مجموعة المنتج : | - |