يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Steam turbine parts diaphgram
Next

Steam turbine parts diaphgram

( Negotiable )

|

1 Piece Minimum Order

بلد:

China

نموذج رقم:

-

سعر فوب:

( Negotiable ) أحصل على آخر سعر

الموقع:

Hebei, China (Mainland)

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

1 Piece

تفاصيل التغليف:

Wooden/steel packages are suitable for International Mulit-transportation

موعد التسليم:

Nomarlly 1-3 months according to customers' r

القدرة على التوريد:

2000 Ton per Year

نوع الدفع:

-

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Hannah

Tianshan Technology Industrial Park, No.319, Xiangjiang Road, Shijiazhuang, Hebei

الاتصال الآن

مواصفات المنتج

  • Sizes:According to your requirement
  • Place of Origin:Hebei, China(mainland)
  • Materials:Alloy Steel, High-Temperature Stainless Steels, High-Tempera
  • Maximum temperature:1100 degrees
  • Strength grade range:205Mpa-1035Mpa

الوصف

GYEP(Hebei Guoyuan Electric POwer Equipment Co.,Ltd)manufacture various types of diaphragms depending on customer needs. We specialize in on time delivery of all the steam turbine parts.
The brief introduction of GYEP diaphragm for steam turbine comprises:
1. Scope of application: 7MW****0MW steam turbine diaphragms, diaphragm of cascade type and direct welding type.
2. Professional advantages: Excellent welding operator and welding equipment, rich experience in welding and heat treatment, complete machining equipments.
Seven-Shafts Robot Automatic Rotary Welding:
Narrow gap welding quality zero defect
Circular automatic rotation
Automatic heat preservation during welding process, effective control of welding temperature
Whole process automatic welding without intermission

Production advantages:
1. Quality assurance: Ensures that all products would be inspected totally, including
chemical composition, mechanical property, hardness, UT, MT, PT, grain size and geometric dimensioning inspections. Inspectors all own ISO***2/EN**3 and GB operation certificate.
2. Production traceability: All the links in the production chain, such as materials incoming inspection, heat treatment, product processing and finished testing, are traceable to ensure products **0% qualified.
3. GYEP successfully passed ISO***1, ISO****1, and OHSAS****1 management system certification in quality, environment and health from ***0 to now. GYEP operationers all own ISO***2/EN**3 operation certificate of UT, MT, PT .

We are original manufacturer for all kinds of connetion parts, so we can provide you with the very same spare parts of steam turbine as the original manufacturer can do.

Special bolt, nut, stud, screw of HP/IP/LP inner & outer casing, diaphragm, valve parts, structual parts, etc.
Bolt, nut, screw of auxiliaries equipments
Coupling bolts and nuts of turbine and generator rotor
Material heat treatment
Steam turbine repair service
power plant overhaul

بلد: China
نموذج رقم: -
سعر فوب: ( Negotiable ) أحصل على آخر سعر
الموقع: Hebei, China (Mainland)
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: 1 Piece
تفاصيل التغليف: Wooden/steel packages are suitable for International Mulit-transportation
موعد التسليم: Nomarlly 1-3 months according to customers' r
القدرة على التوريد: 2000 Ton per Year
نوع الدفع: -
مجموعة المنتج : -

Send a direct inquiry to this supplier

إلى:

Hannah < Hebei Guoyuan Electric Power Equipment Co., Ltd >

أريد أن أعرف: