سعر فوب
أحصل على آخر سعر|
20 Ton Minimum Order
بلد:
China
نموذج رقم:
LG-D
سعر فوب:
الموقع:
-
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
20 Ton
تفاصيل التغليف:
by 1.0 ton jumbo bag.
موعد التسليم:
30 DAYS ON RECEIPT OF THE FIRM ORDER
القدرة على التوريد:
1000 Ton per Week
نوع الدفع:
T/T, L/C
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Mr. Xinglu
No.116 Xinhua West Road, Tangshan, Hebei
Thepre-melting synthetic slag composition is consistent.
The low melting point
quick melting speed
1.Descriptions of Pre-melting syntheticslag
Pre-melting syntheticslag for refined steel-making is newly developed by our company. It is produced through selecting material of high quality, melting the material in electro-furnace, cooling, crashing and screening into different sizes. This product can be divided into following types: CaO-Al2O3, CaO-SiO2-Al2O3-MgO and CaO-Al2O3-BaO-CaF2.We can also adjust and produce the product according to customers' requirement.
Pre-melting
syntheticslag is gained
through melting method and therefore it possesses more merits than
other clinkers:
The composition is consistent.
The low melting point, quick melting speed, good liquidity and good
lubrication make the desulphurization more efficiency.
The product is clumps or grains so that dust pollution in smelting
can be greatly reduced.
It is mainly used for desulphurization and temperature preservation
in high quality steel-making.
2.Pre-melting syntheticslag Specifications:
type |
Chemical content (%) |
||||||||
Al2O3 |
CaO |
SiO2 |
CaF2 |
Fe2O3 |
MgO |
P |
S |
Moisture(%) |
|
1 |
≥40 |
≥40 |
≤5 |
≤3 |
≤1.5 |
≤4 |
≤0.05 |
≤0.02 |
≤0.5 |
2 |
≥35 |
≥45 |
≤5 |
≤3 |
≤1.5 |
≤4 |
≤0.05 |
≤0.02 |
≤0.5 |
3 |
≥30 |
≥50 |
≤8 |
≤4 |
≤2 |
≤8 |
≤0.08 |
≤0.02 |
≤0.5 |
4 |
≥25 |
≥55 |
≤8 |
≤4 |
≤2 |
≤8 |
≤0.08 |
≤0.02 |
≤0.5 |
3.Size: 0-30mm; 5-30mm, other size is acoording to client requirement.
4. Package of the pre-melting synthetic slag: by 1.0 ton jumbo bag
بلد: | China |
نموذج رقم: | LG-D |
سعر فوب: | أحصل على آخر سعر |
الموقع: | - |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | 20 Ton |
تفاصيل التغليف: | by 1.0 ton jumbo bag. |
موعد التسليم: | 30 DAYS ON RECEIPT OF THE FIRM ORDER |
القدرة على التوريد: | 1000 Ton per Week |
نوع الدفع: | T/T, L/C |
مجموعة المنتج : | Auxiliary material for steelmaking |