TZ******5 *-side *-coating Line
Coating line functions:
This is an economic sort of coating line relate to slim ACP
top/bottom coil coating. Product thickness 0.*2 mm ~ 0.1 mm
appropriates for dividing panels This coating line is an
enhance for those coating factories which intend to enhance
product variety. It also matches factories in restricted
measurement.
Application: For coating top coil and bottom coil of ACP(
Aluminium Composite Panel), specially for coating slim gauge
aluminium coil making use of for dividing panels.
Advantage: Economical and also easy to use, tiny dimension
workshop needed
1. Main parameters of coatingline
Material parameter
Thickness: 0.*2~0.1mm
Width: ***0mm
Outer diameter OD(max): Φ***0mm
Inner diameter: Φ**0mm, Φ**5mm
Bobbin material: Steel or paper
Inverval-layers deviation tolerance: ≤0.8 mm (Excluding the
bottom 5 layers and exterior 2 layers)
Coil over-all deviation tolerance: ≤2 mm (Excluding the bottom
5 layers and exterior 2 layers)
Coating thickness: Dry film thickness: 8~*5 um
Product Weight: Max ***0kg(Excluding bobbin)
CCL Processing Speed: *5 m/min (Speed benchmark: thickness
0.1mm coil exclude PVDF coating)
Heating Energy Source: LNG, LPG
Roller coating Process: Continuous 1 side 1 coating &
baking
Properties and features:
Roller width: ***0mm
Coils feeding centering adjustment : ±*5mm
Threading speed: 5~*0m/min(Adjustable)
Line maximum speed: *5m/min
Line speed accuracy: Steady Speed, ±0.1%;Acceleration, ±0.4%
Uncoiling tension range: *0~**0kgf
Processing tension range: *0~**0kgf
Coiling tension range: *0~**0kgf
Tension accuracy: Steady Speed, ±1.0%; Acceleration, ±2.0%
Line space dimensions: ****0mm×***0mm×***0mm
Heating Energy Source: LNG, LPG
2. Basic Production Process
Coil loading → Uncoil machine → Pretreatment (Including
Degreasing, Water washing) → Chromizing → Drying → Re-direction
→ Topside roller-coating → Curing oven → Cooling → Tension
machine → Recoiler → Coil discharging
3. Main devices list
Name Quantity
Coil loading device 1
Sewing table 1
Pretreatment line 1
Drying device 1
Coater 1
Curing Oven 1
Heating system 3
Air cooling devices 1
*-rollers cooling device 1
Tension device 1
Recoil machine 1
Electrical system 1
*Optional configuration: waste gas treatment and energy recycle
system.
4. Water and power consumption of coating line
Total power consumption: *0KW
Compressed air: Min5.5bar,1Nm3/min,actual consumption
0.5Nm3/min
Water: Deionized water, supply quantity is about 4T/h
Heating fuel: LPG or LNG
LPG consumption: 0.2 CBM/min
LNG consumption: 0.5 CBM/min
5. The coating line design and manufacture leads *0 days,
installation and testing leads *0 days.
6.Trade terms: FOB, CIF are available
7.Payment terms: T/T, D/P, LC are acceptable
8. Packing style: Wooden pallet
9. Transportation: by sea