سعر فوب
أحصل على آخر سعر36000 ~ 58000 / Set ( Negotiable )
|1 Set Minimum Order
بلد:
China
نموذج رقم:
JZD-485
سعر فوب:
36000 ~ 58000 / Set ( Negotiable )أحصل على آخر سعر
الموقع:
china
سعر الحد الأدنى للطلب:
36000 per Set
الحد الأدني للطلب:
1 Set
تفاصيل التغليف:
container or flat rack
موعد التسليم:
10days
القدرة على التوريد:
30 Set per Month
نوع الدفع:
T/T, L/C
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Mr. David
daozhaoying, Xinxiang, Henan
1. Specification of Reactor
capacity |
Size ( Diameter * Length) |
Thickness |
Material |
5 tons |
***0mm****0mm |
*4 mm |
**5R boiler steel |
8 tons |
***0mm****0mm |
*4 mm |
|
*0 tons |
***0mm****0mm |
*6mm |
2. Main Features
(1). Safety
a. The waste gas produced during the process is alkyl from C1 to C4, which is dangerous when burning directly.
In our process, it is firstly transferred through waste gas recycle system and a safe device spray gun. Before burning, we should ensure the safety of production.
b. Pressure gauge, alarming device and safety valve.
(2). Environmental Protective
a. Effective water dedusting system can avoid black smoke.
b. The exhaust gas will be recycled for heating reactor to save energy and no pollution.
c. Every junction of the reactor is in good sealing situation with professional sealing material.
d. Waste solid. The solid residua will be left in the reactor. Its main component is black carbon. It can be the raw material industrial black carbon. Also could be mixed with the pulverized coal ash as raw material in thermal power plant, also could be the raw material of pulverized coal ash brick (one kind of environmental protective building material).
3.Usage of Crude Oil
A.power plant factory
B.glass factory
C.cement factory
D.ceramic factory
E.aluminum factory
F.boiler factory
G.central heating factory
H.painting factory
4.Delivery time: *0 days after receiving the advance
5.Warranty period is whole life.
6.We have office in In
بلد: | China |
نموذج رقم: | JZD-485 |
سعر فوب: | 36000 ~ 58000 / Set ( Negotiable ) أحصل على آخر سعر |
الموقع: | china |
سعر الحد الأدنى للطلب: | 36000 per Set |
الحد الأدني للطلب: | 1 Set |
تفاصيل التغليف: | container or flat rack |
موعد التسليم: | 10days |
القدرة على التوريد: | 30 Set per Month |
نوع الدفع: | T/T, L/C |
مجموعة المنتج : | waste tires pyrolysis plant |