سعر فوب
أحصل على آخر سعر|
10 Piece Minimum Order
بلد:
China
نموذج رقم:
Art No. 1D01-100
سعر فوب:
الموقع:
China(mainland)
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
10 Piece
تفاصيل التغليف:
Carton Packing
موعد التسليم:
In half a month
القدرة على التوريد:
3000 Piece per Day
نوع الدفع:
T/T, L/C
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Shelly
No.535, Shifu Rd, Taizhou, Zhejiang, China, Taizhou, Zhejiang
1.Thermostatic Element
Structure Type
2. Operation Principle
The Thermostatic Wax that has
been sealed in shell body induces expansion by a given
temperature, and inner rubber seal part drives its handspike to
move under expansion pressure to realize a transition from
thermal energy into mechanical energy. The Thermostatic Wax
brings an upward movement to its handspike, and automatic control
of various function are realized by use of upward movement of
handspike. The return of handspike is accomplished by
negative load in a given returned temperature.
3. Characteristic
(1)Small body size, occupied limited space, and its size
and structure may be designed in according to the location where
needs to work.
(2)Temperature control is reliable and nicety
(3)No shaking and tranquilization in working
condition.
(4)The element doesn’t need special maintenance.
(5)Working life is long.
4.Main Technical Parameters
(1)Handspike’s height may be confirmed by drawing and technical
parameters
(2)Handspike movement is relatives to the temperature range
of the element, and the effective distance range is from 1.5mm to
*0 mm.
(3)Temperature control range of thermostatic element is
between –*0 ~ **0°C.
(4)Lag phenomenon is generally 1 ~ 2°C. Friction of each
component part and lag of the component part temperature cause a
lag phenomenon. Because there is a difference between up and down
curve of traveling distance.
(5)Loading force of thermostatic element is difference, it
depends on its’ shell size
بلد: | China |
نموذج رقم: | Art No. 1D01-100 |
سعر فوب: | أحصل على آخر سعر |
الموقع: | China(mainland) |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | 10 Piece |
تفاصيل التغليف: | Carton Packing |
موعد التسليم: | In half a month |
القدرة على التوريد: | 3000 Piece per Day |
نوع الدفع: | T/T, L/C |
مجموعة المنتج : | Wax Element |