سعر فوب
أحصل على آخر سعر120 ~ 160 USD / Square Inch ( Negotiable )
|99 Square Inch Minimum Order
بلد:
China
نموذج رقم:
max 4.2m
سعر فوب:
120 ~ 160 USD / Square Inch ( Negotiable )أحصل على آخر سعر
الموقع:
china
سعر الحد الأدنى للطلب:
120 per Square Inch
الحد الأدني للطلب:
99 Square Inch
تفاصيل التغليف:
box
موعد التسليم:
15 day
القدرة على التوريد:
9999 Square Meter per Week
نوع الدفع:
PayPal, Other
مجموعة المنتج :
-
الشخص الذي يمكن الاتصال به xu
Linyi, Shandong
The wood building circular column formwork can be manually
installed and disassembled by **3 workers. It does not occupy the
tower crane equipment. A group of (**3 people) workers can install
****6 circular column formwork in eight hours. If several groups of
workers operate at the same time, the formwork can be installed on
the same day, and the concrete can be poured on the same day. The
next day, the mold can be demolished, and the formwork and concrete
can be continuously installed. Greatly shortened the construction
period for the construction site,
The construction period of traditional steel formwork is shortened
by more than *0%.
Advantage three: good
The wood circular column formwork is made of large-scale plywood,
so that the circular column formwork has less seams and less
joints; while the birch wood quality guarantees the high strength
and toughness of the formwork, the inner and outer epoxy resin is
not only smooth and waterproof but also has a certain ventilation.
Sex, the concrete cylinder is not only smooth and well formed, but
also has excellent visual and hand feel. The overall effect is
better than other similar products and belongs to the water
formwork.
Advantage four: province
1. The price of the circular column formwork is better than that of
the steel formwork. The price of the general wood circular column
formwork is about one-third of the price of the steel formwork,
which saves the builder a lot of cost from the source.
2. The circular column formwork is convenient and quick to
construct. It does not need tower crane equipment. It can be
mass-operated. It shortens the construction period for the
construction of the project. The shortening of the construction
period saves the construction party a lot of expenses, and at the
same time, it has more time to build. More projects.
3, the circular column formwork quality is safe and secure, easy to
operate, easy to save, and can be used with ease and effort.
بلد: | China |
نموذج رقم: | max 4.2m |
سعر فوب: | 120 ~ 160 / Square Inch ( Negotiable ) أحصل على آخر سعر |
الموقع: | china |
سعر الحد الأدنى للطلب: | 120 per Square Inch |
الحد الأدني للطلب: | 99 Square Inch |
تفاصيل التغليف: | box |
موعد التسليم: | 15 day |
القدرة على التوريد: | 9999 Square Meter per Week |
نوع الدفع: | PayPal, Other |
مجموعة المنتج : | - |