يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
45 degree elbow with heel inlet
Next

45 degree elbow with heel inlet

2.5 / Piece

|

2000 Piece Minimum Order

بلد:

China

نموذج رقم:

JC-L-003

سعر فوب:

2.5 / Piece أحصل على آخر سعر

الموقع:

Zhejiang China

سعر الحد الأدنى للطلب:

2.5 per Piece

الحد الأدني للطلب:

2000 Piece

تفاصيل التغليف:

-

موعد التسليم:

2011

القدرة على التوريد:

20000 Piece per Day

نوع الدفع:

T/T, L/C, D/P

مجموعة المنتج :

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Laurie

nanhu, Jiaxing, Zhejiang

الاتصال الآن

الوصف


Product is the PVC resins as main raw materials, auxiliary agents, join the amount by extrusion and injection molding of plastic products, mainly used for building exclude system.

Product standard of GB/T***6.***6.GB/T***6.***6 execution.

Product features:

1. Materialized excellent performance. UPVC pipes, fittings corrosion resistance, resistance to blunt high strength, fluid resistance small, compared with diameter iron pipe flow increased by *0%, ageing resistance and long service life. According to the ministry of construction Fujian pilot data show that use fixed number of year for *0 to *0 years, is building drainage, the drainage materials ideal.

2. Easy installation, qualitative light, durable, and obviously accelerate the progress of the projects and reduce the construction cost.

3. Saving construction cost, use UPVC pipes, fittings with the same specifications than cast iron piping system of comprehensive cost is low.

4. The product is given priority to be white, the color and luster is lively, bright and clean and smooth. To use the company's products can make the building environment clean relaxed atmosphere produce the sense of time.

instructions:

1. Tubing processing. The amount of tubing length after hacksaw, hand-cut saws, small circular saw blades, then both ends should be maintain level, with butterfly file to remove flash and corner, corner shields not be too big.

2. Tubes, pipes adhesive. Adhesive must try before assembly. Cleaning insert shut about *0 mm appearance length and pipe fittings to undertake mouth wall, garnish with the cotton yarn with acetone swabbed, then both on bonding with brush evenly a layer of adhesives, shall not leak painting. Tu hao turn namely after to optimal combination point of view, the pipe into pieces of the mouth, then undertake with wooden percussion, make pipe into the mouth, all for about 2 minutes (can't disassemble or transformation direction) in time to wipe out where the viscose to keep clean pipe.

3. The vertical pipe each layer expansion joints, with a compensation of plastic pipe cold thermal expansion. Indoor traverse pipe is short, and freedom, don't consider a slight compensation install expansion joints.

4. The three way pipe when installation should pay attention to downstream direction, convenient in installation horizontal pipe form natural slope.

5. The vertical pipe each 3 mitres,should be consider to install a pipe clamp, horizontal pipe each 0.6 meters installed a crane clamp.

//

بلد: China
نموذج رقم: JC-L-003
سعر فوب: 2.5 / Piece أحصل على آخر سعر
الموقع: Zhejiang China
سعر الحد الأدنى للطلب: 2.5 per Piece
الحد الأدني للطلب: 2000 Piece
تفاصيل التغليف: -
موعد التسليم: 2011
القدرة على التوريد: 20000 Piece per Day
نوع الدفع: T/T, L/C, D/P
مجموعة المنتج : pvc pipe & fittings

منتجات ذات العلاق Zhejiang Jincheng Plastic Co., Ltd

Send a direct inquiry to this supplier

إلى:

Laurie < Zhejiang Jincheng Plastic Co., Ltd >

أريد أن أعرف: