سعر فوب
أحصل على آخر سعر5534483 USD / Set
|1 Set Minimum Order
بلد:
China
نموذج رقم:
700t/d cement plant
سعر فوب:
5534483 USD / Set أحصل على آخر سعر
الموقع:
shanghai
سعر الحد الأدنى للطلب:
5534483 per Set
الحد الأدني للطلب:
1 Set
تفاصيل التغليف:
10 40ft container, flat rack , open container
موعد التسليم:
120working days
القدرة على التوريد:
20 per Year
نوع الدفع:
T/T, L/C
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Mr. Wei
No.33 Shenxia Road, Malu Industrial Park, Jiading District, Shanghai
In short, limestone and other materials containing calcium,
silicon, aluminum and iron oxides are crushed and milled into a raw
meal.
This raw meal is blended and then heated in the pre-heating
system(cyclones) to start the dissociation of calcium carbonate to
oxide. The meal goes further into the kiln for heating and reaction
between calcium oxide and other elements to form calcium silicates
and aluminates at t a temperature up to ***0 centidegree: so called
clinker burning. The cyclone system is attached to the rotary kiln
by a riser duct. Secondary fuel is fed to the riser duct, the main
fuel mixture, coal/petcock, fires the kiln. Reaction products leave
the kiln as a nodular material called clinker. The clinker will be
interground with gypsum and other materials to
cement.
The equipments we use in this whole production
line are vibrating feeder, jaw crusher, impact crusher, cement ball
mill, lifer, preheating system, cement rotary kiln and packing
machine and so on. All the necessary equipments in this line can be
provided by our factory. We have cement
production line experts
to design specific solutions for your
preference.
After shipping the equipments to destination, if
you need help in the installation of all the equipments, we can
send our engineers to help settle the whole line!
بلد: | China |
نموذج رقم: | 700t/d cement plant |
سعر فوب: | 5534483 / Set أحصل على آخر سعر |
الموقع: | shanghai |
سعر الحد الأدنى للطلب: | 5534483 per Set |
الحد الأدني للطلب: | 1 Set |
تفاصيل التغليف: | 10 40ft container, flat rack , open container |
موعد التسليم: | 120working days |
القدرة على التوريد: | 20 per Year |
نوع الدفع: | T/T, L/C |
مجموعة المنتج : | Cement Production Line |