يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Acrylic acid synthetic tennis court
Next

Acrylic acid synthetic tennis court

|

1000 Square Meter Minimum Order

بلد:

China

نموذج رقم:

AC

سعر فوب:

أحصل على آخر سعر

الموقع:

gaungzhou

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

1000 Square Meter

تفاصيل التغليف:

5 Gallon/barrel & 55 Gallon/barrel

موعد التسليم:

7 days after deposit

القدرة على التوريد:

8 Ton per Day

نوع الدفع:

T/T, Western Union

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به tannie

jiang gao, Guangzhou, Guangdong

الاتصال الآن

مواصفات المنتج

الوصف


Acrylic acid synthetic tennis court

Required Materials
   The materials used for the   ColorPlus System for Concrete Substrate are as follows:
   Primer
   Level Master
   Coat
   For detailed products information consult the individual Specifications.
2.Application of Primer
  It is suggested to apply only 1 coat of Primer.
  The undiluted coverage rate is approximately 0.*5kgs per square meter,per coat.
  The practical quantity depends on the smoothness of the surface.
3.Application of Level Master
  It is suggested to apply minimum 2 coats of   Level Master.
  The undiluted coverage rate is approximately  0.*5kgs per square meter, per coat.
  The practical quantity depends on the smoothness of the surface and the different sizes      of the added sand. 
4.Application of Coat
  the previous two coats is incorporated with sand (texture coat), the third coat can be       applied directly (finish coat).
  The undiluted coverage rate for the texture coat is approximately added with sand: 0.2kgs    per square meter, per coat, added with   Base: 0.**6kgs per square meter, per coat, while    the undiluted coverage rate for the finish coat is approximately 0.*5kgs per square          meter, per coat.
  The practical quantity depends on the different sizes of the added sand. 
5.Application of Line Paint
  It is suggested to apply 1 coat of Line Paint.
  Approximately 3.*5kgs is needed for a standard tennis court.
6.Completion
  Courts can only be put into use after *4 hours when the work comes to an end.
  Upon completion, the constructor shall insure proper removal of all construction debris, 

  surplus materials, empty containers and wash water, and shall leave the site in a   condition     

  acceptable to the owners.
  The court is to be left secure so as to prevent vandalism.

بلد: China
نموذج رقم: AC
سعر فوب: أحصل على آخر سعر
الموقع: gaungzhou
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: 1000 Square Meter
تفاصيل التغليف: 5 Gallon/barrel & 55 Gallon/barrel
موعد التسليم: 7 days after deposit
القدرة على التوريد: 8 Ton per Day
نوع الدفع: T/T, Western Union
مجموعة المنتج : -

Send a direct inquiry to this supplier

إلى:

tannie < GuangZhou jin hong sport equipments co., ltd >

أريد أن أعرف: