FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
الشخص الذي يمكن الاتصال به Mr. mister
zhongxin, hengshui, hebei
HY-Rib Formwork machine production line: It was made of hot-dipped expanded plate, the mesh is shaped by the xxxxx It was cutted, punded the mesh hole, then leave the muscle after xxxxx, stretching the middle partial material, so that it can shape the stretched metal wire xxxxx wire mesh is an kind of permanental penplet, it was made of mesh hole and the muscle of the “u†shaped section, It can save the constructed concrete and shape the caking surface with the constructed xxxxx surface can cement with the new constructed concrete without any processing, it is mainly used in constructing and suturing the constructed concrete.