يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
MSW Garbage Incineration Power Plant

MSW Garbage Incineration Power Plant

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Mr. Bin

#75, Jianshe Road, Heping District, Tianjin, Tianjin

الاتصال الآن

Description

MSW Garbage CFB Incineration Boiler, is speciall designed to treat Municipal Waste with high moisture and complex composition. Based on a few years research and experiment, cooperated with China Famous Academy, with practical check by a few project in China, now we introduce our technology and project to worldwide customer. The Incineration Boiler apply CFB technology, which we have make research on since ***0s. We make adaption to traditional CFB boiler to conform to MSW garbage characteristics. Advanced Gas purification system could effectively reduce dioxin emmission as well as particles. The emission can meet China National Standard. Leachate/Percolate is treated and Methane gas is recycled as fuel for boiler. No additional waste water is generated from Purification or waste treatment system.

Send a direct inquiry to this supplier

إلى:

Mr. Bin < Tianjin Machinery Imp. And Exp. Corp. >

أريد أن أعرف: