FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1set
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
15sets
Payment Type:
-
الشخص الذي يمكن الاتصال به Ms. Janey
North,Jianxin Road, Chongqing, Chongqing
Main technical hook: pull of hook body for one unit: *******0KN quantity of hook body for one handle: 3hooks operating force by handle: <**0N swing angle of hook body in horizontal: *5~*0° swing angle of hook body in vertical: *5° puling speed of electric capstan: *8~*5m/min pull of electric capstan: *0KN~*0KN working diameter of capstan: **0mm electromotor model: YZBE electromotor explosion proof grade: D II BT4 electromoto protection grade: IP*5 electromoto power: 5.5~*5kw power supply: *-AC **0V *0HZ The integrated facilities mainly consist of electric capstan, mooring hook, locking device and the mechanical body. The advantage of the integrated facilities is quick mooring and releasing, when mooring, the operator can control the capstan, and through pulling the lead rope, the hawser of the vessel can be moored on the hook, in this case the mooring operation is finished, when the vessel need to leave the dock, the operator can only put the operation handle or push the button on the panel, the hook can be rotated by the hawser pulling and the hawser can leave away from the hook, all these operations is very easy and convenient, so using the equipment can not only reduce the work intensity but also make all the operation very quickly and automatically, specially in some emergency case, the integrated facility can ensure the vessel leave the dock quickly, and guarantee the safe of the vessel and dock. Material:Adop cast steel or quality alloy steel forging for hook body, quick release hook will be entirely with zinc and the thickness of zinc according to goverment standard or international standard.