FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
5000
Payment Type:
-
Model Number KD-SPEC Automatic startup weaver is when unit after the success and cabinet, need to send and unit, by synchronizer detection signal, effect of electrical adjusted, will stay and unit of frequency and phase automatic adjustment and bus consistent, issued the weaver signal, air switch off, the weaver role. The following is mainly introduced the function of automatic and cabinet: Function (1) automatic allocation load: When Taiwan 2 and above units weaver finished, crew took load operation, load splitter will move, according to the role of electric power unit, proportional distribution load. Function 2. Peak shaving: When Taiwan 2 and above machine parallel-running, in load changes, can according to the size of the load, increase or decrease the number of running unit. Generally when ***** below *5% will solutions listed above *0% ***** units, will start, tied for unit to make the unit operation in the most economic status. This function requirement generator has since start function, to complete. Function 3. Protection function: A: synchronized protection; B: reverse power protection; C: over-current and short circuit protection (completed) by protector, D: over-voltage, undervoltage protection. Function: indicating meter 4. A: the voltmeter, B: ammeter, C: frequency list, D: power list, E: power for tachometer: F: synchronous indicator (with). Observe and temporal-spatial Conclusion: automatic and cabinet main function is air switch off, the weaver. When the generator set start after the success and cabinet, need to send and unit, by synchronizer detection signal, effect of electrical adjusted, will stay and unit of frequency and phase automatic adjustment and bus consistent, issued the weaver signal, air switch off, the weaver role.