FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
3-10 days after paied
Supplying Ability:
10000
Payment Type:
-
الشخص الذي يمكن الاتصال به Mr. Devin
xiaoshan district, Hangzhou, Zhejiang
Application and features
Suitable for butt welding of plastic pipes and / or fittings made
of PE, PP, and PVDF in a ditch in worksite or workshop
Consists of basic frame, hydraulic unit, planing tool, heating
plate, support for planing tool