FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
Hangzhou , China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
Packaged
Delivery Time:
in 45 days
Supplying Ability:
100 Piece per Year
Payment Type:
T/T
الشخص الذي يمكن الاتصال به Mr. xiaoyong
Room 507, Building 3, No 88, jiangling Road, Hangzhou, Zhejiang
SR
|
Item
|
Simbol
|
Unit
|
dates
|
|||
DZL*-X-Aâ…¡-â…¡
|
DZL*-X-Aâ…¡-â…¡
|
DZL*-X-Aâ…¡-â…¡
|
|||||
1
|
Rated steam output
|
D
|
t/h
|
1
|
2
|
4
|
|
2
|
Rated working pressure
|
P
|
Mpa
|
X= 0.8/1.0/1.3/1.6/2.5
|
|||
3
|
Rated steam temperature
|
t
|
℃
|
**5/**4/**5/**4/**4
|
|||
4
|
inlet water temperature
|
tgs
|
℃
|
*0
|
*0
|
*0
|
|
5
|
Heating surface area
|
boiler body heating area
|
|
m2
|
*9.4
|
*9.*4
|
**7.3
|
economizer heating area
|
|
m2
|
*3.*6
|
*3.*6
|
*3.6
|
||
6
|
traveling grate surface
|
R
|
m2
|
2.2
|
3.2
|
4.*7
|
|
7
|
hydrostatic test pressure
|
Ps
|
Mpa
|
1.2/1.4/1.7/2.0/3.**5
|
|||
8
|
water volume
|
V
|
t
|
2.5
|
5.5
|
8.6
|
|
9
|
Designed efficiency
|
η
|
%
|
*4.7
|
*5
|
*5
|
|
*0
|
Whole set device electric power
|
Kw
|
|
|
****5
|
|
|
*1
|
Boiler’s overall dimension after installation
|
|
|
***0×***0×***4
|
****0×***0×***0
|
****0×***0×***0
|
|
*2
|
Boiler’s overall dimension for transportation
|
|
|
***5×***0×***4
|
***0×***0×***6
|
***0×***0×***6
|
|
*3
|
Max unit weight for transportation
|
|
t
|
≈****3
|
≈****1
|
≈****6
|
|
*4
|
Gross Transport Weight of Complete Equipments
|
|
t
|
≈****8
|
≈****6
|
≈****4
|
|
*5
|
quantity and size of delivery container
|
|
|
One *0 foot open-topped container
|
|