يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Slaking tank/ Storage tank

Sell Slaking tank/ Storage tank

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

10 Set

Packaging Detail:

packing in container, bulk or nude

Delivery Time:

within 30 days

Supplying Ability:

10 Set per Month

Payment Type:

T/T, L/C

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به faier

Zhengzhou, Henan

الاتصال الآن

Description

【The introduction】

Slaking tank is very important in the production line of all kinds of steam and pressure
cured brick.Whether it runs well or not has an big impact on the continuous reaction of
the mixed raw materials.It also affects the quality, output and the rate of the final products

【the introduction of the silo storage tank 】

. Silo is a closed tank which is used to contain lime, cement, fly ash and other bulk materials,
. There are marks on the tank which show the amount and position of the material.
. Unblocking device can break up the agglomerations formed when the materials are stored in the tank for a long time.

 
【Productive Process of Aerated Concrete】
(1).Production Process of Aerated Concrete According to the category and quality of raw material, and the features of equipment, the aerated concrete can be manufactured in different processes. Generally, add water to ash, silica sand or slag and crush them into slurry;
 (2) . Then add powdery lime, cement of right amount, plaster, vesicant, foam stabilizer, and mix and pour it to mould frame;
(3).After curing, foaming and hardening, cut it into blocks and boards in different specifications;
 (4).Finally, transport it into pressure steamer with steam-curing cart, and get the light cellular concrete after steam-curing with high temperature and pressure.

【Process Flow of an Annual Output *0,**0m******0,**0m3 Aerated Concrete Steam-Curing Production】

(1) Various raw material storage tanks → (2) Mix dosing → (3) add water to raw material and mix them → (4) prepare the mould → (5) pour → (6) foam and wait → (7) release from mould → (8) turn up, cut horizontally and vertically → (9) make into groups and get into autoclave → (*0) cure under high temperature and pressure → (*1) release the finished products from the autoclave → (*2) test the finished products → (*3) pack → (*4) stack and store up → (*5) leave the factory.

 

Send a direct inquiry to this supplier

إلى:

faier < Henan Good Heavy Machinery Manufacture Co., Ltd >

أريد أن أعرف: