FOB Price
أحصل على آخر سعر0.025 / Piece
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
2 Ton
Packaging Detail:
2000pcs/bale
Delivery Time:
within 30days after order confirmed
Supplying Ability:
5 Ton per Day
Payment Type:
T/T, L/C
الشخص الذي يمكن الاتصال به Ms. vera
East development Zone,Anping,Hengshui,China, Hengshui, Hebei
Step #1: PP resin are extruded into PP
fibers.
This is the first step to control the tensile strength of
Fabric.
Step #2: Extruded PP fibers are woven into the
body fabric by circular looms.
Step #3: Coating thickness: outside coating:*5
micron; inside coating:*0micron
Step #4: Fabric are cut to the length to become
the bag as per customer required size.
Step #5: Stitching can be done by professional
skilled operators.
Step #6: Inspect each bag before packing to ensure
the cleanness and quality
Step #7: Bags are bound into bundles or
pallets.