FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
china
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
as you need
Delivery Time:
about 15 working days
Supplying Ability:
10 Set per Month
Payment Type:
T/T, L/C
الشخص الذي يمكن الاتصال به Ms. selina
Wanghaidian,Shengfa Industry Park,Qinhuangdao, Economic & Technological Development Zone,Hebei P, Qinhuangdao, Hebei
1) The main body latest in materials, structure is smart. Compare with the steel buoy, its weight just equal to 1/3. Transport and suspension setting are convenient.
2) Super anti-impact and good anti-sink ability.
3) Super anti-saltwater and atmospheric corrosion. High temperature and strong sunlight are also couldn't damage it. Anti-biofouling and maintenance-free time is long.
4) Prior to moulding, colour pigment is blended into polyethylene material eliminating the need for costly sandblasting and continued painting.