يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Drilling Fluids Processing System

Drilling Fluids Processing System

2000 ~ 200000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

Tangshan China

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

Nude

Delivery Time:

within 30days after receiving advance

Supplying Ability:

1 Set per Month

Payment Type:

T/T, L/C

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Mr. Saber

No. 166, West Outer Ring Road, Lubei District, Tangshan, Hebei

الاتصال الآن

Description


Oil well drilling Solids Control Equipmentsadvantages.

 

ZJ*0,ZJ*0,ZJ*0,ZJ*0,ZJ*0 drilling rig mud control equipments.

  • GN Solids Control is one of ten china manufacturers who can design and manufacture all the Oilfield  equipments for a complete solids control system.
  • Effective oil well drilling Solids Control Equipments
  • Competitive price Oil well Drilling Solids control Equipments

          GN solids control is  located in China iron production City-Tangshan.The price of raw material here is very low and with high quality.There are also many experienced workforce in solids control equipments production.They work very efficiently. Moreover,we control production cost well by outsourcing some processing work.

  • Normal oil well drilling Solids control equipments
  • 1. Total effective capacity: **6 m3

    2. Qty of Mud tank: 4

    3. Max.designed treatment capacity of system: **0m3/h

    4. Rated WP of water pipelines: 0.6MPa

    5.Rated WP of mud gun pipelines: 4MPa

    6. Total power: **0KW

    7. Specification of main pipelines:

    1Well overflow pipe: DN**0(*2")

    2Connecting pipes of active pit between tanks: DN**0(*2")
    3Connecting pipes for bottom between tanks: DN**0(*0")

    4Suction pipe of mud pump: DN**0(*0")

    5Fresh water pipe: DN*0(3")

    6All pipes are equippted with pipelines from suction inlet of mudpump to dirlling liquid tank; pipelines from well overflow pipe toshale shaker's inlet pipe; pipelines from make-up pump to wellhead andother such pipelines which connected with solid control equipments. 

Send a direct inquiry to this supplier

إلى:

Mr. Saber < GN Solids Control Co., Ltd. >

أريد أن أعرف: