FOB Price
أحصل على آخر سعر1 ~ 9999 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
Shanghai
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
Standard Export Packing
Delivery Time:
It decides by your Qty
Supplying Ability:
4 Tonne per Day
Payment Type:
T/T, L/C
الشخص الذي يمكن الاتصال به Mr. xu
PudongNew District, Shanghai, Shanghai
1.Analyse the Raw Material Chemical
Composition.
2.Sand-Model or Other Shaping
Methods.
3. Pouring the melten steel into
modes.
4.Quenching work piece with special H.T.
Procedures.
5.QC Technicans inspect the products with the qualith control sheet.
6.Surface Treatment.
7.Finally, finish the last processes and cover the protection coat.