FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
Standard wooden package
Delivery Time:
2~4 weeks
Supplying Ability:
500 Piece per Month
Payment Type:
D/P, L/C, T/T
الشخص الذي يمكن الاتصال به Mr. Raymond
Guanzhou Estate, Mintian Management Zone,Shatian Town, Dongguan, Guangdong
Model | PUD****2 | |
Capacity (m3/min) | *2 | |
working pressure | *2 | |
Diesel engine type | EQ6BT5.*-C**0 | |
Installed engine power (Kw) | **8 | |
Fuel tank capacity(L) | **0 | |
Dimensions(mm) | Length | ***0 |
Width | ***0 | |
Height | ***0 | |
Weight | ***0 |