FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
According to the customer request
Delivery Time:
Within 30 days after the order
Supplying Ability:
45 Set per Year
Payment Type:
T/T, L/C, Western Union, Other
الشخص الذي يمكن الاتصال به Jie
HuanglouTown,eastbound 5 km south of road, Qingzhou city,Shandong Province,China, Weifang, Shandong
  Specification Model |
Length Width Height of the floating body |
Number of buckets |
Dredging depth |
Dredging capacity |
Engine |
Main reducer |
Large |
Length: ****0m Width: **3.5m Height: 0.**1.6m |
******0 buckets |
****0m |
******0m 3 |
******0KW |
*******0 |
Medium |
Length:****0m Width:1.**2.2m Height: 0.**1.0m |
****6 buckets |
****8m |
******0m 3 |
*****0KW |
******0 |
Small |
Length: ****2m Width: 1.**2.2m Height: 0.***0.9m |
****8 buckets |