FOB Price
أحصل على آخر سعر5 ~ 15 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
AnHui ,China
Price for Minimum Order:
Minimum Order Quantity:
500 Piece
Packaging Detail:
packing in pallet/bulk
Delivery Time:
within 15 days after confirmed order
Supplying Ability:
30000 Piece per Month
Payment Type:
T/T, L/C, D/P, PayPal
الشخص الذي يمكن الاتصال به Mr. michael
zhufoan town, Luan, Anhui
Bamboo Concrete form panel,also named Bamboo plywood,Bamboo Pane,Bamboo- GluedÂ
 The Bamboo Concrete Form Panel  mainly made from bamboo,it is a new-style formwork as construction material,which is made after a series of mechanical and chemical processes,added measurable glue,and machined by one-time compound hotpressing technology.It contains the advantages as the following:
1. High strength,good tenacity,static camber  of the formwork is about **5 times harder than the wood-glued board,this will be able to reduce the consumption of the formworks supporting in practice.
 2. Wider width,less patching joint( 3 M2/pc),the square equals to the 6.6 pcs of steel formworks at *5.M x 3M,faster formwork supporting and removing job.The expenditure is **2 times less than the normal steel formwork and wood formwork.
 3. Glossy surface,easy for formwork removing job,smooth concrete surface,these will bring you a fast construction schedule to the project and make less cost.
 4. Fine waterproof performance,the adhensive will not come unglued after water boiling,no deformation when be affected with water and damp,indubitable antisepsis and mothproof.
 5. Thermal coefficient of the formwork is 0.***0.*6 W/M.MO,which is much less than the steel formwork ,this is propitious to heat preservation during winter construction work.
 6. High turnover of the formwork due to the both sides utilizing;currently the turnover can be over *0 times under civilized using and proper storage.
 The bamboo- Glued formwork has wide purposes,it is fit for the horizontal or vertical formwork etc,for high-rise,extempore-pouring concrete wall,floor slab,viaduct,cloverleaf junction,main dam,tunnel and beam column construction.