FOB Price
أحصل على آخر سعر1200 ~ 3000 / Ton
|Minimum Order
Place of Origin:
china
Price for Minimum Order:
Minimum Order Quantity:
1 Ton
Packaging Detail:
cases or pallets
Delivery Time:
30days
Supplying Ability:
200 Ton per Month
Payment Type:
T/T, L/C
China
الشخص الذي يمكن الاتصال به Mr. quentin
lianyungang, Qingdao, Shandong
Forged steel flanges (bridas)
Standard:
(1) ANSI B*6.5, A**5 **0LB / **0LB / **0LB / **0LB / ***0LB /
***0LB
(2) DIN ***3 PN6 / DIN ***6 PN*0 / DIN***2 PN*6 / DIN***3 P****0 /
DIN***6 PN*6 / DIN********5 RST*7.2 OR C*2.8
(3) JIS SS**0 OR SF**0 5K / *0K / *6K / *0K / *0K
(4) UNI ***6 / ***7 / ***8 / ***4 / ***9 / ***0 / ***4 / ***2 /
********3
(5) EN***2 PN6 / PN*0 / PN*6 / PN*5 / PN*0 / TYPE1 TYPE2 TYPE 5
TYPE *2 TYPE *3
(6) BS***4 SANI***3 ***0/3, ***0/3, ***0/3, T/D, T/E, T/F carbon
steel flange
(7) AS***9 TABLE D / TABLE H / TABLE E carbon steel flange
(8) GOST *******0 / *******0 carbon steel flange
Types: Slip-On(bridas slip on), Welding Neck(bridas welding neck),
Blind(bridas blind), Socket Welding(bridas socket welding),
Threaded(bridas threaded), Lap Joint (bridas lap joint) and Plate
etc;
Size: 1/2" - *4"
Surface treatment: antirust oil, black / yellow / transparent /
electric galvanized / hot galvanized
Packing: sea-worthy packing in wooden cases or on wooden pallets or
as per customers' special requirement
Min Order Quantity: According to customer's requirement
Delivery: *0 days after receiving the formal order;
Payment: By T/T or L/C
Applications range: Petroleum, chemical industry, water
conversancy, electric power, Natural gas, Coal gas, Water power and
other pipeline projects.