A, applicable scope
YQJC - **0 type switch hydraulic track machine applied many sets of
machine group is used, is the railway switch handling, laying track
of special equipment, it is suitable for *0 ㎠/ m rail switch the
track operation, in order to adapt to the two rail different
clearance, need to adjust the machine two feet distance, adjust
first to loosen the lifting cylinder the Allen screw make lifting
cylinder in the slide in mobile, leg position, after the
confirmation of the screw. Will have been assembled into the switch
through this unit configuration, and then slowly synchronous up the
switch, by adding auxiliary facilities, the overall move to a
predetermined laid position, then through adjustment, complete
switch laid. Also can use single, single line and double rail track
work, carries on the line or ballast bed maintenance. Has the
working efficiency high, the operation is simple, portable, lighten
physical labor, safe and reliable, widely used, etc.
Second, the main technical parameters
1, maximum track force: single cylinder **0 kn
Duplex **0 kn x 2
2, lifting cylinder stroke: **0 mm ± 5 mm
3, system working pressure: *6 mpa
4, manual pump operation force: **0 n
5, road time: < **0 s
6, engine power: 9.5 kW
7, engine revolution: ***0 RPM
8, weight (single) : **0 kg
Three, the basic structure and working principle
The device is composed of internal combustion engine, pump and
multiple directional control valve, oil cylinders, hydraulic system
and track institutions, hook rail mechanism, walking mechanism,
road equipment, manual oil pump, etc. Multiple directional control
valve installed in unloading valve, when hydraulic system overload,
may at any time unloading, ensure the safe use of the machines.
Hook rail institutions and running gear oil cylinder by a reversing
valve control, rail hook of zhang he2 and frame lift linkage, both
operation and two action at the same time, complete, eliminate
misoperation on-orbit hook not when open ascension causes the
possibility of damage to the machine frame, and improve the safety
of the machines. Rail hook as heavy pliers type structure, rely on
the rail hook gravity can automatic hookup rail, simple operation,
and reliable performance.
Working principle: this machine to internal combustion engine as
power, drive gear pump produce hydraulic energy, output hydraulic
oil, by multiple directional control valve allocated to each
execution oil cylinder and action. Track institutions set up two
lifting oil cylinder, through the bottom towing, pressure plate,
screw connection in the track rack, piston lower install two track
leg. When the hydraulic oil into two lifting cylinder cavity on the
two piston rod stretched out, and make leg support ground, through
the hook rail mechanism, the complete machine upward lift,
conversely whereabouts. This machine has two small oil cylinder,
and the control of the mobile mechanism and hook rail mechanism.
This machine is equipped with road mechanism, the road frame to
move clearance outside. The same table machine, can the monorail
and double track at the same time up (but two lifting cylinder
piston out of length difference shall not be more than **0 mm).
Hydraulic transmission principle as shown in figure 2 shows
Four, method of use
1, check the fasteners whether firm, if have, become loose, must
first for fastening, then in the operations, to ensure safe use of
machines and tools.
2, before use, should to be injected fuel tank about *5 litres
clean hydraulic oil, according to the local climate conditions and
different season, general provisions summer choose *0 #, winter
choose *0 #, in use found oil quantity is not enough, should be
added hydraulic oil.
3, engine is the main source of power, before use should first
serious reading random incidental engine specification, familiar
with the matters needing attention and operation method, ensure the
normal working of engine and prolong service life.
4, multiple valve equipped with overflow valve, the system pressure
has been tuned, do not need to adjust.
5, before the use should first of all check whether all normal, and
open reversing valve, check each part separate action is normal or
not. Should know how to reversing valve control direction,
function, to ensure that the correct control.
6, track operation program of work:
6.1 will track machine placed in orbit, start engine, make its idle
run 3 ~ 5 min. Observation components operation is normal or not,
the control system is flexible, reliable, abnormal, stop
debugging.
6.2 multiple valve control handle has three, on both sides of the
control respectively two lifting cylinder. Intermediate operating
handle control hook rail institutions and travel agencies. Among
the handle to "fall, hook" position. The travel agency is raised,
and at the same time rail hook fell on rail jaw the following,
hookup rail.
6.3 according to the operation need (the single or double track)
will be left, right control handle respectively switch to "rise",
piston leg stretch out certain length, began to track, track
quantity size according to the need to control handle. If you need
to single rail track, pay attention to the pistons out of length
difference is not more than **0 mm, to ensure that the track
machine safety operation.
6.4 track homework completed, will be left, right lifting cylinder
control handle respectively switch to "drop", to completely
withdraw leg, intermediate hook line cylinder control lever switch
to "pine, up", rail hook from rail, to stand up to the highest
position, walking wheel fell on the rail, can implement to the next
operating point.
6.5 if road, first to press 6.4 operation, and then to the road
wheel stent in road frame and connect, then control intermediate
hook line cylinder control handle to "fall, hook", make the road
wheel fall next word shelf, walking round up completely, ensure the
equipment in the parts are not affected by rail barrier, then can
be moved to the rail outside, up the road frame to make it in the
clearance of the safe place.
7, track unit operating procedure (the switch of the move, laid)
:
7.1 according to track unit plan (sees attached figure) position,
will track machine installed in the corresponding Numbers
position.
7.2 the unit 7 station track machine for 1 group, users can
according to need to confirm use different sets.
7.3 units in accordance with the provisions after installation,
according to the provisions of article 6.1 check the track machine,
to ensure that the track machine working properly.
7.4 track preparation work
7.4.1 designated persons must be unified command, each track
machine control personnel a clear division of work, responsibility
clear.
7.4.2 equipped with enough auxiliary staff and a clear division of
work, equipped with adequate pad wood and not less than *0 table
double flange double car.
According to the site actual 7.4.3 handling, laid distance, laid
position need, equipped with enough the rail and gauge rod and
other materials, tools.
7.5 switch of flitting homework (switch to line horizontal
direction flitting)7.5.1 obey the command crew after the password,
the track machine control personnel according to article 6.2, 6.3
synchronous operation method, uniform, slowly raise the switch
section of track. Each control personnel should always observe
track machine working state, ensure switch section of track at the
same level. For lifting to a predetermined level, and at the same
time, stop working.
7.5.2 according to line horizontal direction laid block, block the
laying of rail to switch section of track, maintain the level of
rail, rail and between section of track installation double flange
double car.
7.5.3 control track machine will switch uniform, slow underground
to double the car, at this time, should always observe double car
is stable. And switch section of track and the double car
completely after contact, the piston rod back.
7.5.4 slow implementation of the switch section of track to need to
lay line position.
7.5.5 units work together at the same time to switch section of
track up after a certain height, and the dismantling of the
transverse erection rail, block.
7.6 if this time switch has been basically in place, can press the
method adjusting assignment:
7.6.1 laying track position on setting transverse moving double
car, will switch section of track fell on the double cars, track
machine piston take transverse position adjustment, ensure switch
and both line longitudinal to positive.
7.6.2 ballast bed put on the longitudinal mobile double car, to
switch to longitudinal position adjustment, ensure switch and
existing line connection installed in place.
7.6.3 dismantle double car, switch installation ends, the unit
under way.
According to article 7.5 7.7 such as operating procedures switch
lateral movement in place still need to longitudinal mobile,
according to the following method homework.
7.7.1 longitudinal install temporary rail, track tension bar and so
on, and both line connection, in order to make switch longitudinal
mobile.
7.7.2 switch lateral move to scheduled installation line position,
temporary rail mounted on double flange double car, the section of
track uniform, slow down in the double car. Unit stop operation,
oil cylinder piston back.
7.7.3 implement switch section of track and be ready to observe
double car running state whether firm, prevent off way, necessary
adjustment.
7.7.4 through the frog, should will double flange car into single
rim car.
7.7.5 switch section of track vertical arrived at the scheduled
position, unit work together at the same time, raise section of
track, and at the same time, under the section of track
installation of a certain height block, to ensure the stable, in
order to ensure demolition temporary rail when the operation
safety.
7.7.6 dismantle gauge rod, temporary rail, etc., unit work together
at the same time, will switch section of track uniform, softland to
lay position ballast bed.
7.7.7 according to 7.8.1 ~ 7.8.3 method transverse, longitudinal
adjustment operation.
7.8 dismantle switch can refer to the above operation method.
8, such as engine malfunctions or pump failure, need manual pump
work, just reciprocating lift the pressure can be, other operating
method unchanged.
9, in handling to avoid knock against, in case of equipment
deformation and cannot move freely. Should always keep exposed
piston rod in a clean state.
Five, maintenance and repair
1, track machine while refueling must filter, guarantee the
hydraulic oil cleaning, shall not use dirty or mixed impurity of
hydraulic oil.
2, track machine if often use, but half a year cleaning time,
should be used when cleaning brush will oil cylinder, oil tank, oil
passage clean up, pay attention to not wipe with cotton.
3, if has the damage components to change in time, no machines work
in spite of illness.
4, each work **0 hours, deal with machines and tools for inspection
and maintenance:
4.1 check hydraulic system work is normal, and presence of oil
leakage phenomenon, if discovery is unusual, should check whether
the disintegration of hydraulic parts wear, seal for damage and
oil-way are clear, confirmation, replace the corresponding parts or
seal and clean oil circuit.
4.2 agencies working is normal or not, if you have serious abrasion
and deformation, should replace the corresponding parts or
maintenance.
4.3 the connection parts for fastening.
4.4 petrol engine according to the specification for
maintenance.
5, such as is not used for a long period, should be properly
antirust processing, and shoe cover things dust.
Six, safety instructions
1 according to the ministry of railways, the railway engineering
safety rules "concerned regulation, organization construction and
safety protection.
2, the operator shall be subject to technical training qualified
and certified before starting to work.
3, the operator should carefully read this instruction and know the
equipment structure, performance, use method.
4, according to the requirements for the equipment maintenance and
maintenance, and shall not use existing fault equipment
operation.
5, operation process engine or other parts anomaly, shall
immediately stop check and remove the faults to continue after
operation.
6, track unit operation, must be designated persons command, safety
protection, a password call answering system, the operation staff
harmonious and unified operation, ensure the operation safety.
7, track unit operation, any a device must ensure that sound, if
discovery is unusual, shall all be stop operation, debugging.
8, track unit before operation, should according to the work place,
content and so on to carry on careful analysis, research, formulate
the construction plan and strict implementation of the construction
plan requirements.
9, in track homework, don't throw intermediate reversing valve
operating handle, or will cause hook rail institutions and travel
agencies damage.
*0, track machine hydraulic system has overflow valve, when the
load is too high, overflow valve unloading, overflow valve pressure
factory has been adjusted to *6 mpa in use, forbid to adjust.