FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
Quanzhou
Price for Minimum Order:
-
Minimum Order Quantity:
5 Piece
Packaging Detail:
Standard Package
Delivery Time:
30 days after payment
Supplying Ability:
5000 Piece per Month
Payment Type:
T/T, L/C
الشخص الذي يمكن الاتصال به Ms. Xicy
Luojiang, Quanzhou, Fujian
Allpower
Machineryis a company with PRODUCTION, SALES and
SUPPLY. Our factory is located at Quanzhou, the golden triangle of
South of Fujian Province. We are specialized
in MANUFACTURING main kinds of UNDERCARRIAGE PARTS for
excavator and bulldozer, such as track roller( bottom roller /
lower roller), top roller(carrier roller/ upper roller) , idler
assy( front idler) , sprocket & segment, and track chain( track
link assy) for Komatsu, Caterpillar, Hitachi, Volvo, Kato,
Daewoo, Hyundai, Samsung, Sumitomo etc.
Describe
Detailed:
1. Material: *5 Mnb
2.Color: Yellow/ Blue Black
3. Guarantee: 8 Months
4. Certificate:ISO***1:***0
We produce **0mm track link with
*5 Mnb material now!
Our hot track link models:
Komatsu | PC***5(*2link), PC***5(**5**4L,M*2), PC***5(**4**8L,M*4), PC***6(*8 link), PC**0(*2 link), PC****5,6(**5**4L,M*6), PC****3(*5 link) , PC****5(*5 link), PC****5/6(**0**5L,M*0), PC****3(*7L,M*8), PC**0LC*5(*1L,M*0), PC**0L*2(*1L,M*0), PC****5,6(**6**5L,M*2), PC****6(**6**5L,M*2), PC********3(**6**5), D*1A(*2link), D*1P, D*0A, D*0P, D**5, D**5, etc. |
Hitachi | EX**0(*3 link), EX****1(*7 link), EX****2(*6 link) , EX****3(*6 link), EX****5(*6 link), EX**0B(*6link), E****1(**6**5,M*2), etc. |
Kato | HD**0(*7 link), etc. |
Caterpillar | E**0B(*6 link), E**0(*6 link), CAT**5, CAT**0, D8K, D9N, etc. |
Sumitomo | SH**0(*8 link), etc. |
Others | R**0(*0L), R**0( *4L) , EC**0, EC**0, EC**0, EC**0, EC**0 etc. |