FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
Zhangjiagang city,China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Wooden pallet with plastic film covered
Delivery Time:
60 working days since the date of receiving down p
Supplying Ability:
-
Payment Type:
L/C, T/T
الشخص الذي يمكن الاتصال به miller
NO.32 Zhenxing Road,Economic Development Zone, Zhangjiagang.jiangsu, zhangjiagang, Jiangsu
Main Technical parameter
Model |
Capacity(L) |
Effective capacity |
Motor(KW) |
Main Shaft
Speed |
Heating method |
Discharge method |
SHR*5A |
5 |
3 |
1.1 |
***0 |
Self-friction |
Hand |
SHR**0A |
*0 |
7 |
3 |
***0 |
||
SHR**0A |
*0 |
*5 |
7/*1 |
**0/***0 |
Electric |
Pneumatic |
SHR***0A |
**0 |
*5 |
*4/*2 |
**0/***0 |
||
SHR***0A |
**0 |
**0 |
*0/*2 |
**5/**0 |
||
SHR***0A |
**0 |
**5 |
*0/*5 |
**5/**0 |
||
SHR***0A |
**0 |
**5 |
*7/*7 |
**0/**0& |