FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
Hangzhou,Zhejiang province, China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
shipping packing
Delivery Time:
30-45days after receiving the advanced payment
Supplying Ability:
-
Payment Type:
T/T, L/C
الشخص الذي يمكن الاتصال به Ms. Echo
8 Jingguan Ave., Qingshanhu St., Lin\'an, Hangzhou, Zhejiang, China (Mainland), Hangzhou, Zhejiang
1. Cutting: material is cool cut or saw cut.
2. Forging: after heating up, all material blocks are free forged, die forged or ring rolled according to their size.
3. Heat Treatment: We have 6 sets of electric shaft furances,3 sets of high-temperature, car type electric furnaces, and can do normalizing treatment and drawing temper.
4. Machining: Rough parts are machined by engine lathe and digital lathe according to the size, flange type and tolerance requirement.
5. Drilling: The semi-finished-products are drilled.
6. Surface treatment: Die-stamp, wash, paint, oil or galvanize flanges according to the customers' requirement.
7. Packing: Pack the flange as requeste