FOB Price
أحصل على آخر سعر1 ~ 9999 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
Chongqing,China.
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
Export Wooden Packing
Delivery Time:
50 days after signing the contract.
Supplying Ability:
100 Piece per Month
Payment Type:
T/T
الشخص الذي يمكن الاتصال به Mr. Robert
No.65 North Jianxin Road,Jiangbei District,Chongqing,China, Chongqing, Chongqing
• MGO cooling system mainly includes three parts: marine
water chiller, chilled water pump module and water/fuel heat
exchange system, widely used for all kinds of ships and offshore
platform.
• Suitable for many kinds of refrigerants
• As per the requirements, it can suit for kinds of fuel oil
system
• Use PLC to control the water chiller, water pump and
water/fuel heat exchange system to ensure the stable working
condition
• As per the load fluctuation, control the capacity of
compressor, also fitted with hot gas bypass and can run normally
under the low load condition for long time, and ensure the fuel
outlet not more than 2℃/min;
• Installation and commissioning is simple and easy, suitable
for onsite construction and modification.