FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
EPE Wrapped Outside
Delivery Time:
15-30 Work Days
Supplying Ability:
1200 Set per Year
Payment Type:
T/T, L/C, Western Union, Other
الشخص الذي يمكن الاتصال به Jessie
No.3, Building A, Nanfang Commercial Center, Dali, Nanhai District, Foshan, Guangdong
Motor Power | 2.2 x 2 KW | Work Pressure | 0.6 – 0.8 Mpa |
Processing Width | ***0 mm | Max. Diameter of Drilling Hole | Φ3 – φ*1 |
Distance of Two Holes | *2 – **0 mm | Outer Size of Machine | ***0 x **0 x ***0 mm |
\ Weight of Machine | ***0 KG |
Input Power | **0 V / *0 HZ | Min. Hole Distance | **0 mm |
Total Power | 4 x 0.*5 KW | Working Air Pressure | 0.6 *- 0.8 Mpa |
Max. Hole Distance | ***0 mm | Min. Hole Distance | **0 mm |
Max. Hole Diameter | *3 mm | Min. Hole Diameter | 3 mm |
Work Platform Size | **0 x **0 mm | Unit Head | **6 Units |
Weight of Machine | ***0 KG | Outer Size of Machine | ***0 x **0 x ***0 mm |
Input Power | **0 V *0 HZ | Total Motor Power | 2 x 1.5 KW |
Power Head | 2 Units | Work Pressure | 0.6 – 0.8 Mpa |
Size of Work Platform | **0 x **0 mm | Max. Holes Distance | ***0 mm |
Min. Holes Distance | **0 mm | Max. Hole Diameter | *3 mm |
Min. Hole Diameter | 3 mm | Outer Size of Machine | ***0 x **0 x ***0 mm |
Weight of Machine | **0 KG |
|