FOB Price
أحصل على آخر سعر3901 ~ 37960 / Set
|Minimum Order
Place of Origin:
Henan, China (Mainland)
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard containers, bare main machine, motors and small parts are packed in wooden cases.
Delivery Time:
Within 20-25 working days after receiving the down
Supplying Ability:
100 Set per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union
الشخص الذي يمكن الاتصال به Ms. Rene
Tanxiang Road, Zhengzhou, Henan
Hongxing
Mining Machinery is proud of its expertise in machinery
manufacturing and is one of the leading Cement Mill/
Plant Manufacturers in China.
The Cement Production
Line
The whole production process of
cement is generally as follows:
*- Cement Packaging*- Cement equipment (Ball Mill or Vertical
Roller Mill)*- The burning of cement clinker*-Preheat
decomposition*-Raw material homogenization *- Cement Crusher and
homogenizing*- Preparation of raw materials
Â
Hongxing Machinery is a professional cement mill manufacturer in
China, our cement mill price is the most competitive and the
quality of the products are the best.
Parameter
Â
Product specification (m) |
Milling form | Transmission form | Gear box |
Motor power (kw) |
Production capacity (t/h) |
Total weight (t) |
|
Model | Speed reduction ratio | ||||||
Φ1.*3×7 | Open flow | Brim | ZD*0 | 4.5 | **5 | 6.**8 | *3.8 |
Φ2.2×7.5 | Circle flow | Brim | ZD*0 | 5 | **0 | ***0 | *4.8 |
Φ2.2×*1 | Open flow | Central shaft | D**0 | *5.5 | **0 | ****3 | **4.6 |
Φ2.2×*3 | Open flow | Central shaft | D**0 | *5.5 | **0 | ****8 | **4 |
Φ2.4×*3 | Open flow | Central shaft | D**0 | *5.5 | **0 | ****3 | **0.6 |
Φ2.6×*3 | Open flow | Central shaft | MFY**0 | *9.5 | ***0 | ****2 | **8 |
Φ3×9 | Circle flow | Brim | D**5 | *1.2 | ***0 | ****6.5 | **7 |
Φ3×*1 | Circle flow | Central shaft | D**0 | *2.8 | ***0 | ****7 | **0 |
Φ3.2×*3 | Open flow | Central shaft | D**0 | *6.5 | ***0 | ****0 | **5 |
Φ3.5×*3 | Circle flow | Brim | JDX***0 | 5.*4 | ***0 | ****5 | **5 |
Φ3.8×*3 | Open flow | Central shaft | MFY**0 | *6.5 | ***0 | ****2 | **0 |
Φ4.2×*3 | Open flow | Central shaft | JQS***0 | *5.6 | ***0 | ****7 | **0 |
Φ4.6×*4 | Circle flow | Central shaft | JSI***-C | *4.6 | ***0 | ******5 | **5  |