FOB Price
أحصل على آخر سعر10 ~ 200 / Set ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
6 Ton
Packaging Detail:
standard export carton or as per your requirement
Delivery Time:
within 15-25days
Supplying Ability:
5000 Ton per Month
Payment Type:
T/T, L/C
China
الشخص الذي يمكن الاتصال به Ms. Jenna
Wuyuanwan, Xiamen, Fujian
The rack system consists of pillar slice,connecting fitting,dedicated bracket-type connecting beam, dedicated zinc plated rail and the adjustable bottom studs at the bottom end of pillar. In order to facilitate the operation of forklift operators, the pallet limiting beam and forklift limiting stopper are designed at the beginning end of rail and the safty stopper is also installed on the orbit of rails for the mechanical limiting to ensure the safe operation of shuttles
The rail of shuttle is the dedicated rail that is made by one-step molding. The bottom layer is the travel layer of shuttle and the top layer is the layer to place the pallets. The top of shuttle rail adopts wide mouth design, which facilitates to place the shuttle onto the rail.
The adjustment bottom studs at the bottom are designed
with high strength bolts with height adjust. not only ensures the
installation precision in the height direction but also reduces the
influence brought by differential settlement of ground
effectively.
Contact me right now for the details
Skype: Jenna_zhengxj