FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard export carton with palletized or as your request
Delivery Time:
7- workdays based on the parts you need
Supplying Ability:
100000 Set per Month
Payment Type:
T/T, L/C, Western Union, Other
الشخص الذي يمكن الاتصال به Ms. Monica
No.100,Xinmei Road,Wuxi New district, Wuxi, Jiangsu
Specifications
1-Washing Machine Parts Mould
2-Europe quality, China price
3-Prompt reply
4-OEM & ODM is OK
Mould—Spare parts of precision moulds -- Plastic Injection Mould--Washing Machine Parts Mould -- High Grade Washing Machine Parts Mould
Wuxi Gemte Mould Technology Co.,Ltd is professional in making precision mould , If you need mold or spare parts of moulds, please contact us.
Following is the essential information of mold, for your reference.
High Grade Washing Machine Parts Mould and the spare parts of mould
Name |
High Grade Washing Machine Parts Mould and the spare parts |
Mould material |
variously,such as copper, stainless steel, carbon steel, aluminum, plastic,rubber etc depend on your requirement
The Material Classification Of The Mould Designing & Manufacturing 1. Metal Material Aluminum, Zinc, Steel, Copper, Brass, Magnesium, Magnesium alloy, Stainless steel, Sheet metal, Bronze, Aircraft Alloys - Steel, Nickel/Super Alloys, Carbon Steel, Hi-Temperature Alloys, Medical Alloys, Glass Sealing Alloy 2. Engineering Plastic PEEK, PVDF, CPVC, UPE, POM-ESD, PPS, PEI, PSU, PES, PPO, PTFE, PETP, PBT, PET, POM, PC, PAPAI, PBI, PI, PVC, ABS, PP, PE, PU, PA 3. Anti-static Material PEEK, POM, PC, PVC, ABS, Silicon sheet, Nylon board, Organic glass 4. Insulating Material Bakelite, Silicon, Epoxy, Resin, Cold impact 5. PA+GF Material PEEK, PPS, PEI, PETP, PBT, PET, POM, Nylon |
Mould base |
LKM, HASCO etc |
Cavity |
Single/multi |
Design software |
UG, PROE, CAD, CAXA etc. |
Mould life |
5,000,000 shots |
Delivery time |
15-60days |
Specification |
Depends on customer's requirements. |
Steps of the project:
1.RD |
We support customer R&D. Make the files or improve the design if you needed. |
↓ |
|
2.Negotiation |
the quality, price, material, delivery time, payment item, ect. |
↓ |
|
3.Place an order |
according your own design or you chooses our design. |
↓ |
|
4. Mould |
According customers request to build the mould. Before make the mould, we send mould design to customer approval first, before move forward to production; we send samples to customer to confirm first. |
↓ |
|
5. Sample shoot |
If the first sample come out is not satisfied customer, we modify the mould and until meet customers satisfactory. |
↓ |
|
6.Products in store |
If your quantity is beyond our storage, we will provide lead time to you. |
↓ |
|
7. Delivery time |
Delivery goods by sea or by air, according customers requirement. |