يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
FRP Water Tank / GRP Water Tank

FRP Water Tank / GRP Water Tank

50 ~ 5000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

be packed in wooden case

Delivery Time:

Water tank leadtime within 25 days

Supplying Ability:

10000 Set per Month

Payment Type:

T/T, L/C, Western Union

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Ms. Sally

Zhonghua street, Shijiazhuang, Hebei

الاتصال الآن

Description

♣FRP Water tank introduction
FRP Water Tank ,The major advantage is light weight, anti-rusted, non-leakage, long durable time and easy to clean. It is widely used in hotel, school,hospital and coal mine enterprise. It is assembled by moulding single panels, sealing material, metallic parts and pipeline. Water tanks could be custom-made with capacity from 0.**5 m3 to ***0m3 according to your needs. Generally the height should be no more than 4 meters, the length and width can be limitless.
♣frp water tank Specification

Product Name Frp water tank / Grp water tank / SMC water tank
Material GRP/FRP/SMC 
Tank Panel Size  1x1m, 1x0.5m, 0.5x0.5m
Panel shape  Ball shape 
Thickness ***6mm
Volume From 1m3 to ***0m3
Packaging Detai Product packaging by the standards of each country.
From plastic packaging,to a high standard and packed into wooden traysvary in size,depending on the quantity purchased customs pace-saving purposes.
Delivery Detai Water tank leadtime within *5 days

STEP-BY-STEP ASSEMBLY
TANKS FROM 1 TO *0,**0M3 (**0  2,**0,**0 USG)
 
Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align GRP panels to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank. 
Step 7. Position and fix roof panels and if required, roof support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step *0. Finish the internal or external reinforcement.
Step *1. Fill and test.
 

Send a direct inquiry to this supplier

إلى:

Ms. Sally < Hebei Sinta FRP Product Company >

أريد أن أعرف: