FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
الشخص الذي يمكن الاتصال به Mr. Chen
No.12 Huanghe Road, Changshu, Jiangsu
No. | Name | Remarks | |
A. Electric part | |||
1 | Furnace control | Including high voltage cabinet, low voltage cabinet | |
2 | Transformer | ||
B. Equipment part | |||
1 | Furnace shell | ||
2 | Purging system | ||
3 | Low hood | ||
4 | Electronic clamping system | ||
5 | Short net system | ||
6 | Feeding, blending & unloading system | ||
7 | Steel platform | ||
8 | Cooling water system | ||
9 | Tapping system in front of furnace | ||
10 | Hydraulic system | ||
11 | Dust-removal system | ||
12 | Installation and commissioning cost |
|