the mixture of asphalt and stones

the mixture of asphalt and stones

310 ~ 345 / Ton

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Ton

Packaging Detail:

25kgs/bag or 1ton/bag

Delivery Time:

within 7 days

Supplying Ability:

30 Ton per Day

Payment Type:

T/T

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Gina

Shanghai, Shanghai

الاتصال الآن

Description

Product profile
imageRoadphalt all-weather cold paving material is a kind of high-tech road patching material,mixed and prepared by using Roadphalt high-performance cold paving additive,asphalt and aggregate according to certain processing technology,witb an appearance of black grain-like solid,slight petroleum smell,insoluble in water,insensitive to motive impact and static electricity,and with stable properties.The product can be used in all weather,suitable for patching all kinds of road pavement in all weather and environment(even in water),and it can ensure to repair holes,functional ruts,coats or the edges of cement concrete perpetually and simply use without the need of mixing or adhesive layer.
·Main Features
1.suitable for all weather and environment
Roadphalt all-weather cold paving material had a wide applicable environment temperature range of -30ºC-50ºC,with very excellent water-proof property,and it can be constructed in raining/swimming weather and ponding holes.
2.Simple construction
No adhesive oil is needed during repairing and the prepared material can be taken when used,and no heavy-duty equipment is needed.After repairing roads,traffic can be opened immediately.
3.Good repairing quality
Roadphalt all-weather cold paving material has very strong anti-aging property and cohesive property,the repaired holes are not prone to peeling off and crazing etc bad phenomenon,do not need to be repaired repeatedly,and service life can achieve to 10 years over.
4.Being prone to storage
At normal atmospheric temperature,the sealed fill-bag finished product can be stored for as long as two years.
5.Being green and environment-friendly
No dust and black smoke will be produced during the application and production of Roadphalt all-weather use cold paving material,moreover,the finished products are not soluble in water,therefore the atmosphere and underground water will not be polluted,which is beneficial for environment protection.
6.Wide applicability
Roadphalt all-weather cold paving material can be widely used in highway,general roads,municipal roads and facilities,airports,bridge expansion joints and other road repair and maintenance.
7.High material utilization
It can be taken for use any time according to practical usage,and the rest material can be continued for use in next repair,which may not lead to material waste and realize 100% utilization.
·Product Application
imageRoadphalt all-weather cold paving material is simple and efficient for use,and provides an economic,simple and permanent solution for each environment,for not only holes,functional ruts,seam repair,edge maintenance or surface repair(leveling process),and even small mask surface.
Roadphalt all-weather cold paving material can be used in all-weather(regardness of sunny or rainy days/cold or hot days)and can still maintain good usage property though it has a longer storage life.
Roadphalt all-weather cold paving material can be used for repairing the surface of both asphalt and cement concrete without need of bonding oil,and even used in water.The traffic opens immediately after construction is complete.
·Permanent repair of pits and pit covers
imageRoadphalt all-weather cold paving material can be used to repair any pit cover very successfully.When using cold paving material,bonding oil is not needed in general due to the good cohesive capacity of Roadphalt all-weather cold paving material itself.For holes with water,Roadphalt all-weather cold paving material can be filled derectly and the water is not needed to remove first,meanwhile Roadphalt all-weather cold paving material with most cold pavement seal coat materials,pouring sealant are miscible,the repaired pavement can also keep contact,cohesive property and provide enough usage property.
 
·Repairing functional ruts and trenches
In the construction projects of municipal roads or highways,its necessary to dig out trenches on pavement to lay out the pipelines or construction tap water or drainage pipes,while using hot stirred asphalt mixture for repair may bring about many problems.In many cities,millions of money is cost on curing and patching the trenches every year.If reasonable procedures are followed,Roadphalt all weather cold paving material can be taken as a kind of permanent trench-patching material.As all the other materials,Roadphalt all-weather cold paving material should form a tight,solid basis without sinkage,and thus it can prevent the failed patching for trenches caused by sinkage,ruts or transposition.
To get the best compaction effect,the thickness of Roadphalt all-weather cold paving material should not surpass 5cm in every paving construction.The best compaction effect can be obtained by applying the vibrating roller with steel wheel.If the steel wheel roller is not suitable for the trenches to be rolled,iron ram can be used manually to compact the trench.
The consolidation of Roadphalt all-weather cold paving material can reach as high as 40% before getting to the highest density.When patching a 5cm deep hole,the height of Roadphalt all-weather cold paving material should be 2cm higher than the original pavement,to make the best compaction degree achievable.
 
·Permanent repair of pits and pit covers
Roadphalt all-weather cold paving material can be used to repair any pit cover very successfully.When using cold paving material,bonding oil is not needed in general due to the good cohesive capacity of Roadphalt all-weather cold paving material itself.For holes with water,Roadphalt all-weather cold paving material can be filled derectly and the water is not needed to remove first,meanwhile Roadphalt all-weather cold paving material with most cold pavement seal coat materials,pouring sealant are miscible,the repaired pavement can also keep contact,cohesive property and provide enough usage property.
 
·Process of construction
 1、Sweep:Generally,the gravel and waste residues in and around the holes to be repaired should be removed thoroughly,and there should not be slurry or gravel in holes.The holes or surrounding trenches in highways or municipal roads should have regular edges,and for removing waste residues,the solid hard surface should be seen before construction.
2、Fill:Fill enough Roadphalt all-weather cold paving material into the holes until the material is 1.5cm or so higher than the ground surface.For repairing highways or municipal roads,the input amount of cold paving material can be increased by 10%-20% or so,after filling the holes over,the central site of the holes should be a little higher than the surrounding pavement and assume arc shape.
3、Compact:Thoroughly press the pavement compacted to get a sound base,the better pavement compaction method is to use steel-wheel road roler or vibrating road roller,and for small holes,shovel can be used to press it compacted.The repaired holessurface should be clean and regular without wheel marks.The periphery and edges of the holes must be pressed compacted and without loosing.The degree of repair compaction should reach 93% above for common roads and 95% above for highways.
4、 Open the traffic:after the repair is complete,the road should be smooth,flat,no wheel tracks,no loose after forming the road.
image 
  Sweep                Fill                Compact          Open the traffic
·Conventional
1、 How to dealing with the groove/potholes?
Just simple treatment,the holes/trench with gathered water can be filled directly.
2、 How long does the storage shelf life of the product?
The fill-bag sealed finished product can be stored as long as one year at room temperature.
3、 After construction,how long can open the traffic?
Putting the material into holes and then compaction slightly.That means the traffic is opened immediately after the patching is finished.
4、 How to choose a suitable mixture gradation?
·Appendix:information about Roadphalt all-weather cold paving material product
I、Physical Data
Boiling point(ºC):N/A
Steam density:heavier than air with a volatility of 0-4%
Color:black with a slight smell of petroleum
Gravity property:heavier than water
Evaporating speed:slower than ether
Solubility in water:negligible
Remarks: 
       *(1)Smoke
     *(2)Total dust
       *(3)Statement by national professional safety and health organs:the average emitted amount should be controlled within 100mg/3-8h
 
III.Combustion and Explosion Data
Flash point:177℃
Explosion limit:None
Combustion:None
Extinguisher:Carbon dioxide,foam,dried powder and water fog
Special fire fighting procedures:wearing a full face normal pressure self-contained breathing apparatus.When spilled into the burning water of foam from container,may cause bubbles,and its more dangerous.
Unusual fire and explosion data:Dont use water to prevent foaming.Dont use welding or cutting equipment around the material,in case of products combustion or explosion.
IV.Reaction Data
Stability:stable
Conditions to be avoided:None
Incompatibility:contact with strong acid,oxidant and other petroleum products should be avoided to keep the properties stable
Harmful decomposition or side products:Carbon oxide and other organic polymer may be generated through decomposition when heated
Harmful polymerization:None
V.Safety Precautions
Eyes:wear protective glasses
Skin:wear penetration-proof cloth,rubber gloves and rubber shoes
Inhalation:supplied-air respiratory equipment which ensures safety must be put on if in closed environment
Ventilation: providing sufficient machine(generally local exhaust)for ventilation to prevent vapor accumulation
Mask: wear dust-proof mask
VI、Health Safety Data
Skin:long-term or repeated contact may cause moderate irritation or dermatitis.
Inhalation:lung or nasal cavity may be irritated which results in dizziness,tachypnea and nausea etc symptoms.
Intake:may lead to gastrointestinal discomfort,nausea,vomiting or diarrhea.
Carcinogenicity:None
Remarks:allergy may occur with the product like any other chemicals.
 
VII.Emergency and First-aid Measures
Being splashed into eyes:a great deal of moving clear water should be used to cleanse for 15min at least,and if there still is discomfort,go to visit the doctor immediately.
Skin contact:take off the polluted clothes immediately,cleanse the skin with soap and clear water,and if there still is itching or red swelling,go to visit the doctor immediately.
Inhalation:transfer the patients to a ventilated and cool place and go to visit the doctor immediately.
Intake:keep the patients to calm down,and go to visit the doctor immediately.
Remarks:go to visit the doctor immediately if there is any adverse condition.
 

Send a direct inquiry to this supplier

إلى:

Gina < Shanghai Roadphalt Asphalt Technology Co >

أريد أن أعرف: